Fire Damper Maintenance at St George's Hospital and Kingston Hospital NHS Trusts
The value below is a framework or dynamic market ceiling: the maximum
that could be spent across all call-offs, not the value of a single contract.
Aggregate figures on this site exclude these to avoid double counting.
key details
| Status | complete |
|---|---|
| Category (CPV) | 35110000 |
| Deadline | 16 Jun 2023 |
| Contract start | 1 Sept 2023 |
| Contract end | 31 Aug 2026 |
| Procedure | selective |
| SME suitable | No |
| OCID | ocds-b5fd17-1c875c7e-37e4-43dc-beee-03522eca7a82 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Indepth Services | £0 | 31 Aug 2023 | active |
description
Fire damper maintenance
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 17 Aug 2023 | Award (award) | · | 27e4224e-c406-43a0-a3b1-0484e09193e3-673017 |
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Depot Fire Hydrants Design and Build - Tranche 1 · Transport for London · £3,232,541
- Testing of Hose, Fittings and Couplings · East Sussex Fire Authority · £80,000
- LSL/GS/0132 - The Supply of Common Captured Persons Handling Kit · LEIDOS SUPPLY, LIMITED · £450,000
- HVP Life Jackets · Merseyside Fire and Rescue Authority
- 10" High Volume Pump Hose · MERSEYSIDE FIRE AND RESCUE AUTHORITY · £777,751
- GB-Hull: Hydraulic Cutting Equipment · BIP SOLUTIONS LIMITED · £64,402
- P3410 · BIRMINGHAM CITY COUNCIL · £3,202,531
- Hepacart Fire Equipment · QE FACILITIES LIMITED · £66,704
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.