Thames Tideway Tunnel - C405 Main Works West - Bulkheads (Acton)
key details
| Value | £1 |
|---|---|
| Status | complete |
| Category (CPV) | 45262670 |
| Region | London |
| Deadline | 16 Jun 2020 |
| Contract start | 25 Jun 2020 |
| Contract end | 30 Jun 2020 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-0303d179-3104-4e4f-a1ac-a8b5bcfaf2b0 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | £3,880 | 18 Jun 2020 | active |
description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
- a.tunnels:
- i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
- ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
- b.Worksites:
- i.five main tunnel Worksites (drive and/or reception sites)
- ii.16 CSO Worksites
- iii.two System modification Worksites Thames Tideway Tunnel
- iv.works at Beckton Sewage Treatment works.
Section 4: Scope of Works
Supply a price for manufacture and deliver 4no. Bulkheads 3 design (i.e. 8 x Panel 3a, 4 x Panel 3b). Weld detail is included in the latest drawing file (Acton Bulkhead Drawing BH3-6 P02 (Latest)).
No construction or manufacture should commence until BMB have confirmed approval of drawings. Approved for construction drawings will be issued as soon as they become available.
All deliveries are to be in accordance with the delivery requirements (FORS).
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
BMB-JV Tideway West, Acton Storm Tanks, Canham Road, W3 7SR
Additional information: BMB-JV Tideway West, Acton Storm Tanks, Canham Road, W3 7SR
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Jan 2021 | Award (award) | · | c4703176-d62e-4422-8495-fb0891301da1-404418 |
more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
- Thames Tideway Tunnel - C405 Main Works West - Carnwath Road Pit Bottom Steel Alterations · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Intertidal Terrace · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Pipe Jacking works for Syphon Main ACTST · £500,000 · 9 Apr 2021
- Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking · 12 Mar 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Security Gates & Fencing · £1 · 17 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Main Tunnel Steel Connection Shutters · 5 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead · £1 · 21 Oct 2020
- Thames Tideway Tunnel - C405 Main Works West - Putney Tunnel Connection Shutter · 21 Oct 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- IMO Front Barrier Replacement Works 2025 · Department for Transport · £25,000
- Metal and Brick Work Community Resilience - AWARD · Thirteen Housing Group Ltd · £26,960
- GB-St. Helens: Air Source Heat Pump protection cages · Torus Group · £60,000
- Steel Work Requirements · Redcar & Cleveland Borough Council
- Metalwork repairs to gates and associated items · NEWCASTLE CITY COUNCIL
- BE24045 - Metal discs · UK SHARED BUSINESS SERVICES LIMITED · £15,485
- MTC small engineering & general metalwork for callouts, repairs and planned maintenance to all Council properties & locations · Belfast City Council
- Metalwork QQ · Newcastle City Council · £100,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.