Foundation For Good's Vision For Lasting Impact

Foundation for Good Published 16 Aug 2024 Contracts Finder

key details

Value£500,000
Statusactive
Category (CPV) 45210000 +1 more
RegionNorth East
Deadline23 Aug 2024
Contract start4 Nov 2024
Contract end14 Feb 2025
Procedureselective
SME suitableYes
OCIDocds-b5fd17-1b02c94a-ddc1-42ee-bf65-df9d59e77131

description

Foundation for Good is embarking on a comprehensive refurbishment project for its community building located at 11-19 Trafalgar Street, Consett, County Durham. This project, funded by the Community Ownership Fund, aims to enhance the facility's functionality, accessibility, and sustainability to better serve the local community.

Scope of Work:

The project includes the following key elements:

Demolition and Removal:

Careful removal of non-load-bearing interior partitions, existing flooring, and suspended ceiling systems.

Structural demolition including the removal of staircases, sections of brickwork to create new doorways, and the sealing of a former loading bay.

Handling and disposal of hazardous materials such as asbestos following all health and safety regulations.

Structural Works:

Construction of new walls, partitions, and mezzanine flooring.

Installation of new windows and doors, including access control systems.

Repair and reinforcement of existing structures where necessary.

Mechanical, Electrical, and Plumbing (MEP) Works:

Installation of a new HVAC system, including air purification units.

Complete rewiring of the building, installation of energy-efficient lighting, CCTV systems, and data cabling.

Plumbing upgrades in restrooms with water-saving fixtures.

Interior Finishes:

New flooring installations, including rubber flooring in the gym and carpeting in classrooms and offices.

Wall finishes in accordance with the new colour scheme, and ceiling replacements.

External Works:

Replacement of windows with double-glazed units and painting of the building's exterior.

Installation of solar panels and an air source heat pump system to improve energy efficiency.

Minor roof repairs and installation of a lockable loft hatch.

Compliance and Sustainability:

All work must adhere to British Standards, particularly concerning fire safety, durability, and environmental impact.

Implementation of waste management practices with a focus on recycling and proper disposal of construction debris.

Timeline:

The project is scheduled to begin in November 2024, with completion targeted for February 2025, ensuring all work aligns with the funding deadline of March 2025.

Contractors:

Contractors are expected to coordinate with the project manager for regular inspections and testing. Weekly site meetings will be required to ensure the project stays on schedule and within scope.

The successful contractor will demonstrate a strong track record in similar refurbishment projects, adherence to health and safety regulations, and a commitment to quality and sustainability.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
16 Aug 2024 Tender (tender) · 70d0b0ad-0be8-4a91-99ea-07a04dca9673-778275

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.