Sizewell C - HR Monitoring (CRX & Building) Package

Sizewell C Limited Published 27 Mar 2026 Contracts Finder

key details

Value£5,000,000
Statusactive
Category (CPV) 71311000 +21 more
Deadline10 Apr 2026
Contract start30 Oct 2028
Contract end4 Mar 2030
SME suitableYes
OCIDocds-b5fd17-fef0fc6a-e18e-4e8d-a410-788d1080f1f6

description

Overview of Scope

Supply and installation of the HR Monitoring System to the to CRX and Nuclear Island Building

The EAU (containment monitoring) system is required to continuously monitor and assess the mechanical behaviour and integrity of the Reactor Building and integrity of the Reactor Building and associated at nuclear island at Sizewell C (SZC) throughout construction, testing, and operation. The system scope covers the design, supply, installation, commissioning, and documentation of:

Monitoring sensors (including extensometers, temperature probes, hydraulic levelling pots, pendulums, invar wires, inclinometers, hygrometers, and pressure sensors)
Associated cabling, connection/grouping boxes, and acquisition/data logger cabinets
All necessary software interfaces and data collection/reporting tools

More than 200 sensors will be embedded and installed in both the inner containment wall and the common raft of the nuclear island.

The EAU monitoring system must provide real-time and periodic data on:

Settlements and deformations of the nuclear island raft (topographical markers, hydraulic levelling pots, extensometers, and temperature sensors)
Overall containment distortions (pendulums and invar wires)
Localized deformations and tendon failure detection (embedded extensometers, local monitoring devices)
Tension in prestressed cables (dynamometers)
Environmental parameters (temperature, humidity, internal and external pressure)

All EAU system components must comply with the Book of Technical Specifications (BTS) Chapter 9.04 and associated referenced as well as client installation and interface requirements. Instruments must be delivered with calibration certificates and installed in accordance with manufacturer and project-specific procedures.

The EAU system contractor will also provide:

Installation studies and execution drawings for all phases (temporary/erection and permanent/operational)
Material Approval Forms, Inspection and Test Plans, Quality Release Certificates, and Lifetime Quality Records (LTQR)
Data collection, reporting formats, and periodic analysis files as required by the client (monthly/bi-monthly during construction; weekly/daily during key phases; and as specified during operation)

Additional information: It will be beneficial for you to describe your business as much as possible and highlight where you can help us to achieve our values described above

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
27 Mar 2026 Tender (tender) · 5ec0fb87-1fe6-492f-9a9a-20cfb71fb2dc-890326

more from Sizewell C Limited

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.