Provision of Support for Structural Integrity Assessment at Step 4 of the GDA for UK ABWR

Health & Safety Executive Published 18 Nov 2016 Contracts Finder

key details

Value£164,851
Statuscomplete
Category (CPV) 73000000
Deadline25 Apr 2016
Contract start11 Jul 2016
Contract end31 Oct 2017
Procedureselective
SME suitableNo
OCIDocds-b5fd17-fe3d6709-adc9-11e6-9901-0019b9f3037b

Award

SupplierValueDateStatus
Frazer Nash Consultancy £164,851 17 Jul 2016 active

description

This programme of work incorporates five individual work packages and bidders are invited to bid for, and can be awarded, one, multiple or all of the work packages.

The successful TSC(s) is required to provide technical support to ONR, during Steps 4 of GDA, to independently assess the UK ABWR structural integrity Pre-Construction Safety Report (PCSR) submissions.

  • Work Package 1: Review of Compliance with Design Requirements of ASME III • Work Package 2: Review of Defect Tolerance Assessment & Undertake Comparative Calculations for selected VHI Welds and Locations• Work Package 3: Review of selected Topic Reports • Work Package 4: Review of Pipewhip Methodology and Undertake Comparative Calculations • Work Package 5: Review of selected Design Reports

Identification of any necessary UK ABWR information required from the RP. ONR will formally submit these to RP as Regulatory Queries, but the contractor is expected to support ONR in the identification of information required. Review of part, or all of, any responses provided by the RP in answer to any queries raised in conjunction with completing the work package. Support to ONR during technical meetings with the RP. This might include, for example, discussions on information required to undertake or attending video/teleconferences or face-to-face meetings in the UK (Liverpool). Progress meetings via teleconference at either the TSC or ONR office. These should be brief and no more frequent than monthly. The contractor should report the results of this work in individual reports to ONR covering: the review of compliance with the design criteria of ASME III (Work Package 1); the review of defect tolerance and results of comparative defect assessment calculations (Work Package 2); the review of the topic reports (Work Package 3), the review of the Pipewhip Methodology and results of comparative calculations (Work Package 4) and, the review of the design reports (Work Package 5). The reports should contain full details of the work undertaken, discussion of the review, summary, conclusions and a full reference list.

For the purposes of this procurement exercise, the work requirement has been broken down into five individual Work Packages and bidders are invited to bid for, and can be awarded, individual work packages, multiple work packages or the total programme. Bidders must provide details of the work packages they propose to bid for.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Award (award) · 49dbb1a6-6534-4b52-bae2-1b6b94785289-105047

more from Health & Safety Executive

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.