Arun District Council - Arun Transport Study 2016
key details
| Value | £50,000 |
|---|---|
| Status | active |
| Category (CPV) | 71311200 +1 more |
| Region | South East |
| Deadline | 1 Dec 2015 |
| Contract start | 16 Dec 2015 |
| Contract end | 4 Jun 2016 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-fde22e3e-adc8-11e6-9901-0019b9f3037b |
description
Arun District Council is commissioning a Strategic Transport Study to inform the preparation of main modifications to the Arun Local Plan which covers the area outside the South Downs National Park. The project will run from December 2015 with a deadline date of 4th July 2016 and must be completed within a budget of £50,000.
Consultants must be experts in the field of transport modelling with the ability to provide at least three examples of working on similar projects to a high standard.
The study will be undertaken in three stages as follows:
Stage 1 – Local revalidation of the West Sussex County Transport Model (WSCTM) for the Arun area to create AM and PM peak flow models applicable to local traffic flows.
Stage 2 – Test Development Option Scenarios using a range of model runs to inform the identification of a preferred development option from a transport viewpoint.
Stage 2a – A level crossing assessment will be run alongside Stage 2.
Stage 3 – Test Preferred Strategy Option, including the identification of suitable mitigation measures which would reduce the impact of development upon the network. This stage requires environmental impact testing; scheme costings; select link analysis and a Stage 1 Safety Audit of mitigation designs to be undertaken by a certified person.
The consultants will be required to report back to Arun District Council on a monthly basis. The fee proposal submitted must allow for attendance at four meetings:
Study inception (The Council and West Sussex County Council (WSCC));
Model revalidation – discuss any issues arising (The Council, WSCC and Highways England (HE));
Conclusions from Stage 2 and transition to Stage 3 (The Council, WSCC and HE) and;
To discuss study conclusions and final report (The Council, WSCC and HE)
Prior to submitting a bid, the consultants must identify whether there are any potential conflicts of interests that may impact upon the contract. If it is considered that there is or may be a conflict of interest, the council must be clearly notified.
Additional information: The tender documents are currently available on the following E-tendering portal and once you have registered you will have full access.
https://in-tendhost.co.uk/sesharedservices/aspx/Home
Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/sesharedservices/aspx/
documents
- https://in-tendhost.co.uk/sesharedservices/aspx/ , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/4ca1ef5c-bfcb-4e60-853c-73cbbc76bb60 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 12 Nov 2015 | Tender (tender) | · | ocds-b5fd17-fde22e3e-adc8-11e6-9901-0019b9f3037b-79465-adc---003930 |
more from SE Shared Services
- TDC RP Tree Management Services - AWARD · £600,000 · 3 Feb 2021
- RBBC - IM - Mixed Paper - AWARD · 3 Feb 2021
- BHCC MH Floating Support Service · 1 Feb 2021
- ESCC JC Provision of Services to Remove Bodies on Behalf of HM Coroner (Coroner Removals) - AWARD · 1 Feb 2021
- ESPH AB Hastings Wayfindings (ESPH403 TI) - AWARD · £122,000 · 29 Jan 2021
- WSCC DW Oathall Community College Roof Replacement - AWARD · £55,597 · 28 Jan 2021
- WSCC DW Field Place Roofing Replacement - AWARD · £105,797 · 28 Jan 2021
- WSCC - TH - Manor Field Primary - Flat roof and flooring replacement - Reduced Scope - AWARD · £403,553 · 22 Jan 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PAHT - Transport Planning, ego-tech and ecological consultancy · The Princess Alexandra Hospital NHS Trust · £52,350
- Movement and Place · City of York Council · £1,150,000
- Traffic Signals - Installation Support · Newcastle City Council · £1,000,000
- Mass Transit Commercial Support Services · West Yorkshire Combined Authority · £104,000
- WNC support for BSIP,EP and zero Bus Emissions Strategy · West Northamptonshire Council
- Strategic Transport Support Services · Blackburn With Darwen Borough Council · £150,000
- GLCCA - Mobility Hubs Feasibility Study in Greater Lincolnshire · Greater Lincolnshire Combined County Authority · £40,001
- GLCCA - Water-based Transport Feasibility Study in Greater Lincolnshire · Greater Lincolnshire Combined County Authority · £18,001
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.