gvtcx

New build Milford Diagnostics Centre for MRI and CT Diagnostics Imaging at Milford Hospitalv2

Royal Surrey Hospitals NHS Foundation trust Published 9 Sept 2022 Contracts Finder

key details

Statusactive
Category (CPV) 45215120
Deadline30 Sept 2022
Contract start1 Feb 2023
Contract end1 Feb 2025
Procedureselective
SME suitableNo
OCIDocds-b5fd17-fd2e3d55-a313-4383-bba0-7bff1a4f45d1

description

The Royal Surrey NHS Foundation Trust propose to develop a new-build facility for Magnetic Resonance Imaging (MRI) and Computed Tomography Imaging (CTI) at the Milford Hospital, Tuesley Lane, Godalming, Surrey GU7 1UF. The building is single-storey with a link corridor to the existing Rehabilitation Building at Milford Hospital. The building also has plant rooms and a service yard with an acoustic fence to accommodate the mechanical and electrical services at the rear. Associated works include the construction of a new access road from Tuesley Lane that will be initially used for construction, and on completion will be re-surfaced for maintenance, servicing, deliveries and access for waste-bin vehicles. Also proposed is the provision of additional car parking for 18 cars, 3 motorbikes, and 6 bicycle racks, the erection of an electricity substation, and the installation of foul drainage and attenuation soakaway for SUDS drainage

The site was considered suitable and viable for this facility as it would help the Royal Surrey NHS Foundation Trust in its quest to be become a pre-eminent cancer hub in the South-East of England. Milford Hospital already provides plain X-Ray and ultrasound facilities and the location of MRI and CT diagnostic imaging will suitably complement the existing facilities and widen the scope of available diagnostic imaging services across the Royal Surrey Hospital sites.

Milford Hospital lies in a site of approximately 2.3hectares. It accommodates a 1980s ward block known as the Rehabilitation Building having an area of 1,764m2, a 1 1/2 storey newly refurbished X-Ray block of 122m2, a two-storey Victorian building for Community Services Management offices, a small, detached building shed and a redundant building. The site for the new diagnostics centre is the grassed area to the east of the Rehabilitation Building and bounded by a wooded strip to the north and the east towards Tuesley Lane.

The new Milford Diagnostics Building is 1,963.15m2 consists of:

  • oClinical Facilities:
  • o2no MRI Scanner Rooms, Control Rooms, Engineering Technical Rooms
  • o1no CT Scanner Room, Control Room
  • oPatient Cannulation Rooms
  • oCounselling and Interview Rooms
  • oRecovery Rooms
  • oPatient Changing Rooms
  • oPatient WCs
  • oClean and Dirty Utility Rooms
  • oStaff and Non-Clinical Facilities
  • oReception
  • oMain Waiting Room
  • oSub-Waiting Room for CT
  • oOffices
  • oStaff Changing Rooms
  • oStaff WCs
  • oMechanical and Electrical Services
  • oService Yard
  • oPlant Room
  • oGenerator Room
  • oMedical Gas Storage
  • oLow Voltage Electrical Room
  • oOil Bunding Tank
  • oService Void floor in the roof space above the ground floor accommodation with 3no roof access shafts into the service void.
  • oBin Enclosure
  • oAcoustic Fencing

Associated works consist of:

  • oExternal Works
  • oAccess Road from Tuesley Lane for construction phase
  • oAccess Road for maintenance, service, ...

Additional information:

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
9 Sept 2022 Tender (tender) · 67986a58-71d8-4a06-b9b9-e44d4fdf666e-570401

more from Royal Surrey Hospitals NHS Foundation trust

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.