MMIC BMS and EMS Annual Maintenance and Validation

CPI (Centre for Process Innovation) Published 27 Mar 2024 Contracts Finder

key details

Statusactive
Category (CPV) 31000000 +1 more
Deadline12 Apr 2024
Contract start6 May 2024
Contract end5 May 2028
Procedureopen
SME suitableYes
OCIDocds-b5fd17-fa496e45-79c9-4f50-a51e-22d2cafc5a25

description

The BMS and EMS system currently runs on Siemens Desigo CC and the facility is on the course to being a fully GMP compliant facility. There are currently ten BMS panels on the site with several sensors and control points that feed into these panels from various cleanroom and plant equipment.

Our EMS and BMS systems both use the same sensors for control and monitoring but operate slightly differently. Our EMS system is fully audit trailed and validated yearly to keep this in line with GMP requirements. The EMS monitors all data coming from our clean rooms which monitors the temperature, humidity, airflow, and differential pressure across all four cleanrooms, service corridors and auxiliary areas.

On site we currently have the below equipment and system checks required to be covered under the service agreement

  • o4 cleanrooms all fitted with 2 control panels, 4 differential pressure probes along with a temperature and humidity sensor. Each it will need to be fully calibrated annually along with all calibration reports provided.
  • oWe currently have 11 air handlers in total, 5 of these feed into our cleanroom areas while the other 6 units feed into control offices and event areas. All units have 2 fan speed controllers, 7 pressure transmitters, 1 fresh air temperature sensor, 3 temperature humidity sensors and 2 velocity meters. All of which require to be calibrated annually along with calibration reports.
  • oDifferential pressure switches that will need to be inspected to ensure the electrical operation of the circuit is running as it should.
  • oAs well as this, the switch setting must be checked, and you must ensure that it responds to changes in pressure.
  • oAir and water flow switches that will need to be inspected to ensure the electrical operation of the circuit is running as it should. The switch setting must be checked to ensure that it responds to change in flow. Actuators/Valves/Dampers/Water Meters- Check the operation of actuators across their full stroke and ensure correct positioning over the analogue output range. Ensure actuator limit switches operate correctly along with Check power fail action operates correctly by simulating mains failure. Check valves for leaks and repair where applicable and ensure minimum let-by in the closed position. Check that the valve and damper linkage are fitted securely. Check that damper blades and linkage operates operate correctly throughout their range, without undue stiffness. Advise relevant Building Services Engineer of any mechanical problems.
  • oControl Checks - Check the stability of all plant visually along with System Operation Checks. Authorisation will be sought from a member of the CPI operational Engineering team prior to isolating any plant, and care will be taken that any checks do not unduly affect environmental conditions. The system will be set to its 'off' condition (where possible) and check correct response of all controlled equipment. Along with Simu...

Additional information:

For more information please see the tender documentation, that is free to access on https://in-tendhost.co.uk/uk-cpi/

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
27 Mar 2024 Tender (tender) · df0757e3-ad85-4e5e-b42c-071ad6aca8b5-736068

more from CPI (Centre for Process Innovation)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.