The works consist of the removal and replacement of a series of defective fire doors. To undertake upgrading of the fire stopping and fire walls. To erect a fire lobby and to install directional exit signage, all within the roof void of the Central Library. The extent of the works is laid out within the Schedule of Works and are summarised below:
Within Milton Keynes Central Library roof void, there are 2 types of fire break walls, these being:
Wall type 1 - are the original Lightweight timber stud wall (double wall) with a 12mm plasterboard panels sandwiched in between. The Stud wall built to underside of steel beam. Above the beam, there are softwood truss rafters , again these are twinned up with 12mm plasterboard panel sandwiched in between. These roof trusses above the steel beams and the timber studworks underneath the beam are clad in visqueen clear plastic sheeting.
Wall type 2 are the later installed vertical mineral fire blankets, which have been suspended down form the pitched roof and lap on to the ceiling line. It transpires that the number of these additional fire breaks was excessive and compromised the means of escape.
In both walls there are short (average 600 x 800mm fire doors) installed to assist movement between these break wall off a gantry.
The walls which are to be retained, and have new fire door installed and upgrading of fire stopping are:
Walls - B, C, E, H, J and K
The walls which are to be retained, but no longer to be designated as fire break walls and are to have the fire doors removed are:
Walls - A, D up to the abutting fire stopping around the Atrium, F and G.
Further works
Electrical intake and switch room and the old water tank mezzanine floor above.
In this area, the contractors is to remove all defective patch repairs to stud walls and fully make good and fire stop around all structural and services breaches and around all wall/floor and wall/pitch roof perimeters. The remedial works are to achieve a minimum of 90mins fire stopping throughout this room and be Certified.
To strip out existing door and frame set leading into Roof void at point L9 and replace with a new FD30S fire door and frame set.
Staircase into Roof void and above protected stair well.
In this area, the contractor is to supply and fit fire blanket from the underside of the roof timber decking down to and onto to the inner face of the blockwork walls on 3No elevations.
On the ply lined timber studwork and blockwork wall between stairwell and roof void, the contractors is to supply and fit fire blanket from the underside of the roof timber decking down to and onto to face of the plywood lined studwork and to the top of blockwork walls on this elevation
New Lobby in Roof void
In this area, the contractor is to construct a new fire rated lobby area. This lobby is to be constructed on the gantry floor and to the roof pitch line.
The tender documents and drawing are
...
Additional information: For any suppliers interested in this opportunity please visit our e-Tendering portal - https://in-tendhost.co.uk/milton-keynes/aspx/Home
Is a Recurrent Procurement Type? : No
documents
- https://www.contractsfinder.service.gov.uk/Notice/5e054024-dc40-4670-a298-a86c28d8688d , tenderNotice
- https://in-tendhost.co.uk/milton-keynes/aspx/
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 Nov 2024 | Tender amendment (tenderAmendment) | · | 5e054024-dc40-4670-a298-a86c28d8688d-801545 |
more from Milton Keynes Council
- Carers Support Service - Learning Disability and Neurodivergence Specialist Provider · 6 Feb 2025
- Carers Support Service - Mental Health Specialist Provider - Market Engagement · 4 Feb 2025
- Security Partner and Guarding of Void Properties · 30 Jan 2025
- Milton Keynes City Council Supported Living Framework - Market Engagement · 28 Jan 2025
- Children and Young People (CYP) Emotional Wellbeing Support · 27 Jan 2025
- Gas , Plumbing and Heating - Corporate Landlord · 21 Jan 2025
- All Age Advocacy Services · 16 Jan 2025
- Consultancy services for Leisure tender Pack · 15 Jan 2025
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Beyond Housing - BH-2026-FW-058 Fire Door Inspections, Maintenance & Installs · PROSPER
- PAHT - Pharmacy Fire Door Replacement Works · Princess Alexandra Hospital NHS Trust · £30,000
- Fire Safety and Compliance - Remediation Works · Reading Borough Council · £1,600,000
- MEDIUM RISE COMMUNAL FIRE DOOR INSPECTIONS · SHEFFIELD CITY COUNCIL · £114,978
- Fire Door Remedial Works · Westminster City Council · £450,000
- ENHT - Towers and Theatre Fire Door upgrades - Phase 1 · East and North Hertfordshire Teaching Hospitals NHS Trust · £75,000
- GB-Colchester: 0436 - Supply & Installation of Fire Doors to CBH Housing Stock · Colchester City Council · £1,000,000
- DN772392 Internal Fire Risk Assessment Repairs · London Borough of Hackney · £2,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.