key details

Value£300,000
Statusplanning
Category (CPV) 09332000
SME suitableYes
OCIDocds-b5fd17-f0155a2a-5ab6-4691-8050-e12431f1aff6

description

This service is required to maintain circa. 80 solar PV installations currently managed by the Energy Team within Cornwall Council. These O&M services are fully outsourced and not undertaken in-house. The services sit alongside the energy management of the estate, including energy procurement and renewable PPAs. As part of Cornwall Council's Climate Emergency Action Plan there is also a target to install 2MW of new renewables per year and it is likely the maintenance requirements of the new schemes would be incorporated into this service as they come online. This market test is for maintenance services only.

The scope of this service includes but is not limited to annual inspections and maintenance of the arrays both internally and externally; remedial maintenance and repairs as identified to be necessary; improvements and upgrades as identified as beneficial to the Council; ensuring the regulatory compliance of the installations with any present and future legislation; the provision of an online portal where the generation and export data (where applicable) can be viewed and downloaded and the management of Cornwall Council's FiT portfolio including submitting meter reads. The portfolio must be managed by a competent account manager with the relevant skills.

The maintenance service covers 78 rooftop arrays, 3 ground mount arrays (including the 5MW Kernow Solar Farm) and 1 solar canopy distributed across Cornwall. Please see the attached spreadsheet for locations and array sizes. There are also several arrays at various stages of project development and Cornwall Council is committed to installing 2MW of new renewables per year. Therefore, the portfolio of solar PV held by Cornwall Council is constantly changing and the ability to add and remove arrays to the contract is essential. The future mix of solar PV systems will likely include more ground mounted solar PV systems of approximately 1MW in size.

Our current supplier provides annual inspections and cleaning of the arrays, a dedicated account manager who project manages all inspections and remedials, access to all necessary online portals to provide oversight of generation and export data (where applicable) and management of the Council's FiT portfolio.

The required outcomes are arrays generating their highest potential yield through good management; annual inspections; remedial and compliance works as necessary; clear and accurate recording of energy generation on a live database; and annual reports on array generation and yield.

The below are the requirements of the service:

Proper operation of the PV systems
Provide and maintain a controls and monitoring system
Ensure Cornwall Council access to the information produced from the controls and monitoring system and ensure CC is capable of direct receipt of information from the system
Ensure Cornwall Council has access to all generation and export data (where applicable)
Comply with the procedures and requirements set out within

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
28 Aug 2023 Planning (planning) · cb20ba02-dc4f-4b01-92eb-7301600a0ec0-675552
18 Jun 2025 Planning (planning) · 7e5742ee-3366-4873-acae-5645a09172cf-850270
27 Jun 2025 Preliminary market engagement (UK2) Procurement Act 2023 035831-2025

more from Cornwall Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.