Rig Switch and Zeros Upgrade to the UoB Theatre
key details
| Status | complete |
|---|---|
| Category (CPV) | 33162000 |
| Deadline | 23 Apr 2021 |
| Contract start | 25 Apr 2021 |
| Contract end | 31 Jul 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-f52d8802-f3ab-4946-a816-b1a62065fbfc |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Stage Electrics | £29,574 | 31 Mar 2021 | active |
description
Replacement of theatre mains disitributed power with controllable non-dim rig switches.
Supply and installation of programmable lighting control panels in downstage right wing, control room and dimmer room. Additional Led compatible fixtures
Mains replacement Rig Switches
To disconnect and remove the existing mains board supplying the non-dim power to 36 outgoing ways within the theatre space. Supply and install a new smaller mains board in the same location to provide power to the two new Rig Switches. To supply and install 2No. 2410 MCB Non Dim Rig switches in a new location above the stage area and extend the existing cables from the 36 ways to this new location. Power for the new Rig switches.
Additional Non Dim Outlets 0
From the new Rig switch dimmer noted above, connected to the spare 12 ways, supply and install 2No. New 16amp supplies to the dimmer room area and 10No. New 16amp outlets in a facility panel next to the Rig Switch. Please note that the maximum power to these outlets will be 10amp as this is governed by the Rig Switch MCB's.
ZerOS Server and Button Stations
To supply and install in the existing control room rack, 1No. Zero 88 ZerOS 2048 channel server and connect to the existing lighting desk in the same room. To also supply and install 1No. 2 Button Panel DSR, 1No 2 Button panel in the control room, 1No, ICAN Button Station in the dimmer room and 1No. ICAN Button station in the control room, all cabled back to the new ZerOS server. To also replace within their existing locations, 1No. Zero 88 Gateway 8 and 2No. Zero 88 Splitter 8's, removing the existing and replacing with new. Installation of the described system are included, this also includes full commissioning, testing and training service. All equipment is supplied with 1 year site warranty (details available on request).
Additional information: To bid for this opportunity please contact: Alexander Perry email: Alexander.Perry@beds.ac.uk within the published timescales
The University of Bedfordshire terms and conditions apply to any contracts resulting from this tender.
documents
- https://www.contractsfinder.service.gov.uk/Notice/b02baf22-1e13-49fb-9943-69a371106a30 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 16 Jun 2021 | Award (award) | · | 467cc711-8560-4c73-b367-ca0a32596ec5-444096 |
more from University Of Bedfordshire
- Measured Building Surveys at University of Bedfordshire, Luton Campus · £49,988 · 10 Feb 2025
- Lexis Library Contract · £100,486 · 7 Feb 2025
- UoB HPE Server · £30,898 · 4 Feb 2025
- Business Source Premier database · £32,112 · 2 Dec 2024
- Academic Search Complete · £36,406 · 2 Dec 2024
- Elsevier Read and Publish · £79,379 · 2 Dec 2024
- PPM Services for Alarm works covering campuses Luton, Stoke Mandeville, Putteridge Bury and Bedford · £129,249 · 2 Dec 2024
- PPM Services for Fire Equipment covering campuses Luton, Stoke Mandeville, Putteridge Bury and Bedford · £74,362 · 2 Dec 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- VIMS Camera Stack · QE FACILITIES LIMITED · £171,078
- ESNEFT3106 - Purchase of Camera Stack & Scopes · East Suffolk and North Essex NHS Foundation Trust
- Da Vinci Robots - Intuitive Medical · Norfolk and Norwich University Hospitals NHS Foundation Trust · £2,327,179
- Wound Retractors/Protectors · Regional Business Services Organisation Procurement and Logistics Service · £985,000
- Patient Temperature Management Access Agreement · Norfolk and Norwich University Hospitals NHS Foundation Trust · £349,473
- Electrosurgical Consumables and Related Accessories 2025 · Supply Chain Coordination Limited · £56,320,000
- Versius Minimally Invasive Surgical Robot · The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust · £710,400
- Purchase of ENT Microscope · Leeds Teaching Hospitals NHS Trust · £78,477
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.