gvtcx

Bridges Backlog Maintenance - Package 1 - 2016/17

Swindon Borough Council Published 29 Jul 2016 Contracts Finder

key details

Value£125,000
Statusactive
Category (CPV) 44000000 +1 more
RegionSouth West
Deadline1 Sept 2016
Contract start16 Sept 2016
Contract end25 Nov 2016
Procedureopen
SME suitableYes
OCIDocds-b5fd17-f356d080-adc9-11e6-9901-0019b9f3037b

description

Bridges Backlog Maintenance – Package 1 - 2016-17

Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for the provision of the following work items:

Project Description

The works associated with Bridges Backlog Maintenance – Package 1 will include the following:-

i)Establishment and maintenance of site compound(s).
ii)Establishment and maintenance of subway closures and footbridge closures including pedestrian diversion signage.
iii)Establishment and maintenance of signal controlled lane closure.
iv)Temporary works appropriate to the works.
v)Vegetation clearance.
vi)Demolition of small bridge incorporating steel beams, transverse timber sleepers and concrete deck slab.
vii)Demolition of a small corrugated steel (Armco) culvert.
viii)Supply and install 2 x 1050mm diameter pipes in concrete surround.
ix)Construct brick headwalls with mass concrete backing.
x)TORC cleaning and/or grit blasting of wing walls and edge beams.
xi)Painting of concrete surfaces, e.g. subway walls and soffits.
xii)Preperation and painting of metal parapets.
xiii)Localised parapet repairs, e.g. welding and grouting.
xiv)Mastic sealant to joints.
xv)Excavation and reinstatement of bitmac footpaths, depth 90mm.
xvi)Overlay bitmac footpaths, depth 30mm.
xvii)Concrete repairs to edge beams and ballast walls.
xviii)Rebuilding of masonry parapet including reinforced concrete coping.
xix)Masonry repairs to small stone arch brick.
xx)Removal of a timber bridge deck and replacement with anti-slip GRP decking.

Contract Period

The contract will be initially for a period of 2 1/2 months commencing 16th September 2016.

The relevant tender documents are included within this project webpage as attachments.

Tender Responses are required to be submitted no later than 1st September 2016, 14.00GMT by hardcopy to Swindon Borough Council only (refer to the Invitation to Tender document)

If you require any clarifications on the tender documents please submit these in writing via e-mail, including the project name clearly in the e-mail title, to Tomasz Wysocki at hppd@swindon.gov.uk between 29th July to 19th August 2016, 12.00 GMT.

The Council’s responses to these clarification questions will be uploaded as attachments on the project webpage attachments section. Therefore it is the Contractor’s responsibility to check the site regularly for updates to clarifications, as you will not be advised when updates have been made.

In the event of difficulties downloading tender documents, please refer to the named contacts Tomasz Wysocki at hppd@swindon.gov.uk.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Tender (tender) · 2563938c-364e-47e7-bdb1-ffc3ac06dc22-104080

more from Swindon Borough Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.