The Pirbright Institute Brooksby Building - SIL 1 HVAC Shutdown System from Overpressure and Underpressure Hazard Scenarios
key details
| Value | £100,000 |
|---|---|
| Status | active |
| Category (CPV) | 45331210 +4 more |
| Deadline | 1 Aug 2023 |
| Contract start | 1 Sept 2023 |
| Contract end | 31 Aug 2024 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-1843cb24-4ea2-4238-9f05-bff3140efd5d |
description
Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility. The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans. As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1. Safety Requirement System (SRS) attached at the back of this document for more detail.
Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511. A non-exhaustive list of typical deliverables for such a project is as follows:
| • | Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves) |
| • | Bill of Materials (BoM) for all materials and accessories to be purchased |
| • | Quotations for all required materials |
| • | Functional logic diagrams (if required) |
| • | I/O lists |
| • | Functional Design Specifications (FDS) |
| • | Loop diagrams |
| • | Instrument wiring diagrams |
| • | Electrical wiring diagrams |
| • | Control panel layout and drawings |
| • | Safety Integrity Level (SIL) Verification report |
| • | SIL certifications for all relevant hardware (if available) |
| • | Factory Acceptance Test (FAT) procedures |
| • | Site Acceptance Test (SAT) procedures |
| • | Safety Instrumented System (SIS) installation and commissioning plan |
| • | SIS validation plan |
| • | Safety manuals |
| • | Proof test procedure |
| • | Spare parts list |
| • | Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS). |
documents
- https://www.contractsfinder.service.gov.uk/Notice/2525728e-4119-414e-b923-c7594bdcc422 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/0f5b3504-3f5c-4865-bf17-bbecb9f6547a , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/4243b72c-5b89-4734-8b8f-5d426f08a359 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/65bc701a-a9c1-4b06-98bd-4c81c9f27ea1 , evaluationCriteria
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/6bde9744-0d5e-443d-8c77-cecaacfeb088 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/6fa47044-d9d3-42c8-a861-a4ff699915ee , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/7b69d00f-4384-45f6-8508-cddc36d47165 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/87839fb7-a9c4-40ec-9bd1-11a4798a140a , technicalSpecifications
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/a8127c02-1405-47ee-a07f-6b2bc2045b7b , contractDraft
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/e1bc263f-5dfb-4357-a8f3-907aa665ba6f , biddingDocuments
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
3 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 15 Jun 2023 | Tender (tender) | · | 2525728e-4119-414e-b923-c7594bdcc422-653587 |
| 4 Jul 2023 | Tender amendment (tenderAmendment) | · | 2525728e-4119-414e-b923-c7594bdcc422-659187 |
| 21 Jul 2023 | Tender amendment (tenderAmendment) | · | 2525728e-4119-414e-b923-c7594bdcc422-664840 |
more from THE PIRBRIGHT INSTITUTE
- Provision of Occupational Health and Wellbeing services · £55,000 · 21 Jan 2025
- CHP LTHW Heat Recovery Principal Contractor · £315,000 · 2 Dec 2024
- Supply and Install of Uninterrupted Power Supply to BACS Control Panels · £50,000 · 12 Nov 2024
- Project Management re. Brooksby Building BACS additional works · £100,000 · 8 Nov 2024
- ISO 11 Incinerator Life Extension Project - WP10 Hydraulic System Replacement Project · £50,000 · 31 Oct 2024
- ISO 11 Incinerator Life Extension Project - CEMS · £130,000 · 14 Oct 2024
- ISO 11 Incinerator Life Extension Project - WP6 Diesel Tank Replacement · £30,000 · 24 Sept 2024
- ISO 11 Incinerator Life Extension Project - WP 5 Refractory Replacement · £450,000 · 9 Sept 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Award of Upgrading of Communal Extract Fans in Mountain Halls Accommodation Buildings, Treforest Campus · University of South Wales · £150,000
- Norse-Cromer Hospital -AHU11 Replacement · Norfolk and Norwich University Hospitals NHS Foundation Trust · £232,631
- Mortuary Ventilation · The Queen Elizabeth Hospital King's Lynn NHS Foundation Trust · £244,558
- EDC/2025/4359 Damp & Mould Survey, Eradicate, Reinstate, Prevent · East Dunbartonshire Council
- TEC Partnership - General Ventilation Service 2025 · TEC Partnership · £60,000
- EDC/2025/4251 DAMP & MOULD ERADICATE, REINSTATE & PREVENT (ERP) · East Dunbartonshire Council · £2,250,000
- CBC-1818-T-SK - Damp and Mould - Cause Investigation, Remedial Works, Ventilation/Extraction Installation, Mould Treatment and Monitoring - AWARD · Central Bedfordshire Council
- Rastrick Ventilation Works · West Yorkshire Fire and Rescue Authority · £70,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.