THE PIRBRIGHT INSTITUTE Published 15 Jun 2023 Contracts Finder

key details

Value£100,000
Statusactive
Category (CPV) 45331210 +4 more
Deadline1 Aug 2023
Contract start1 Sept 2023
Contract end31 Aug 2024
Procedureopen
SME suitableYes
OCIDocds-b5fd17-1843cb24-4ea2-4238-9f05-bff3140efd5d

description

Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility. The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans. As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1. Safety Requirement System (SRS) attached at the back of this document for more detail.

Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511. A non-exhaustive list of typical deliverables for such a project is as follows:

Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves)
Bill of Materials (BoM) for all materials and accessories to be purchased
Quotations for all required materials
Functional logic diagrams (if required)
I/O lists
Functional Design Specifications (FDS)
Loop diagrams
Instrument wiring diagrams
Electrical wiring diagrams
Control panel layout and drawings
Safety Integrity Level (SIL) Verification report
SIL certifications for all relevant hardware (if available)
Factory Acceptance Test (FAT) procedures
Site Acceptance Test (SAT) procedures
Safety Instrumented System (SIS) installation and commissioning plan
SIS validation plan
Safety manuals
Proof test procedure
Spare parts list
Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
15 Jun 2023 Tender (tender) · 2525728e-4119-414e-b923-c7594bdcc422-653587
4 Jul 2023 Tender amendment (tenderAmendment) · 2525728e-4119-414e-b923-c7594bdcc422-659187
21 Jul 2023 Tender amendment (tenderAmendment) · 2525728e-4119-414e-b923-c7594bdcc422-664840

more from THE PIRBRIGHT INSTITUTE

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.