Turbines for the Tidal Industry Energiser Project (TIGER) Interreg Channel Programme
key details
| Value | £350,000 |
|---|---|
| Status | active |
| Category (CPV) | 42110000 |
| Deadline | 16 Dec 2021 |
| Contract start | 4 Jan 2022 |
| Contract end | 31 Mar 2022 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-eef19627-718d-46ea-a369-0a8b24fac58e |
description
The project requires the provision of a tidal turbine, to be fitted to the existing gravity-based foundation. This foundation will be retrieved in late 2021 and refurbished to accommodate a new horizontal axis turbine. The horizontal axis turbine should be rated no more than 500Kw and available by the end of March 2022. Initial design investigations, coupled with the consents available at the site have indicated that a horizontal axis turbine which is compatible with both the existing subsea base and consents will be the preferred solution.
Additional information: Please apply directly to the buyer using the contact details provided, tender documents will then be made available to you.
documents
- https://www.contractsfinder.service.gov.uk/Notice/1ad9c430-46c1-4abd-8d8b-51c99b2b46af , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 16 Nov 2021 | Tender (tender) | · | 1ad9c430-46c1-4abd-8d8b-51c99b2b46af-486009 |
more from Craig Pullen Consulting
- Isles of Scilly Seabird Recovery Project -Operational Plan · £20,000 · 20 Nov 2024
- Refurbishment and Capital Works Improvement · £5,011,966 · 9 Sept 2022
- Enabling Works Package · £497,620 · 30 Jun 2022
- Infrastructure Installation Services · £242,083 · 7 Jun 2022
- Procurement, Delivery, Building and Installation of Furniture at the South-Central Institute of Technology · £345,000 · 7 Mar 2022
- Audio Visual - Supply of Equipment and Installation Services · £129,246 · 14 Feb 2022
- Procurement of IT Technology equipment for the South-Central Institute of Technology · £130,000 · 4 Feb 2022
- IoT South - Bletchley Campus · £10,400,000 · 9 Aug 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PURCH2558 Provision of Replacement Motor · University of Glasgow · £174,800
- Dry Dock Pumps · PENZANCE DRY DOCK (2009) LIMITED · £88,000
- Tidal Turbines · QED Naval Ltd
- supply of an Avtur fuelled Capstone C30 Micro-Jet Turbine and its containerisation, suitable for operation in the Antarctic conditions expected at Halley Station · UK SHARED BUSINESS SERVICES LIMITED · £110,578
- Containerised Capstone C30 Avtur unit for BAS · UK SHARED BUSINESS SERVICES LIMITED · £110,071
- Maintenance of Power Turbines, Gas Turbines and Alternators at Greenwich · Transport for London · £9,200,500
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.