Analysis to determine the optimal UK rapid charging network for electric vehicles
key details
| Value | £50,000 |
|---|---|
| Status | active |
| Category (CPV) | 73000000 |
| Deadline | 1 Mar 2017 |
| Contract start | 9 Mar 2017 |
| Contract end | 31 May 2017 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-eeb1cbbc-be68-47a2-9af0-9ef1179d3ebb |
description
The CCC's recommendations on the level of the first five carbon budgets are based on a set of scenarios demonstrating how the CCC's trajectories of emissions reductions can be achieved in each sector of the economy, through deployment of technologies to reduce greenhouse gas emissions. The CCC has a statutory duty to advise the Government on the most cost-effective path to decarbonisation, taking account of the range of criteria in the Climate Change Act.
The UK is legally bound by the Climate Change Act to reduce its emissions by at least 80% below 1990 levels by 2050. In some sectors of the economy, such as agriculture and industry, it is more challenging and costly to reduce emissions than in others, such as power. Some sectors, including transport, must reduce emissions by up to 90% to achieve an economy-wide 80% reduction. This implies that in the road transport sector the car, van, bus and HGV fleets would need to be almost entirely zero or ultra-low carbon by 2050.
For its advice on the Fifth Carbon Budget period (2028-2032), the CCC developed a central scenario (the Medium Abatement scenario) for road transport emissions. This scenario is designed to be consistent with the objective of delivering car, van, bus and HGV fleets that are almost entirely zero or ultra-low carbon by 2050.
Ultra-low emission vehicles (ULEVs) are vehicles with zero or near-zero tailpipe emissions which make use of electricity from an increasingly decarbonised power sector. Two types of ULEV are plug-in hybrid electric vehicles (PHEVs) or battery electric vehicles (BEVs), collectively referred to as electric vehicles (EVs). PHEVs have both an electric motor and an internal combustion engine. They can be recharged using a plug or refuelled using petrol or diesel. BEVs only use electric motors and derive all power from battery packs, which are recharged using a plug.
A survey of public attitudes towards electric vehicles by DfT in 2016 identified recharging as the most important factor deterring people from buying an electric car or van. 45% of driving license holders surveyed reported charging as a deterring factor. These license holders listed concerns about the availability of charging points, including lack of charging points in their area and lack of knowledge of where charging points are.
Currently available electric vehicle chargers can broadly be classified in 3 main categories: Slow chargers, Fast chargers and Rapid chargers. The naming scheme is indicative of the amount of time it would take each type of charger to charge a vehicle, with rapid chargers delivering the most power in the shortest available time. Cheaper slow chargers tend to be installed in places where cars are likely to be parked for long periods (i.e. home or workplace). Rapid chargers are significantly more expensive, but offer a valuable decrease in charging time, making driving long distances a practical option. Not all electric vehicles currently on the market can charge us
documents
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/3faf7c0c-9147-445c-8bcf-e0137b654bae , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/72d0f7f1-4193-4f66-90b8-42521e520286 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/d810a2a9-c663-4eb5-8577-536d9b032029 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/db63d117-c8a1-4f4e-a330-244c32c20b50 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Feb 2017 | Tender (tender) | · | db63d117-c8a1-4f4e-a330-244c32c20b50-129503 |
more from The Committee On Climate Change
- Scoping study to assess the resilience of the UK's cold supply chain to rising and extreme temperatures · £80,000 · 17 Apr 2024
- Developing spatial indicators of vulnerability to the impacts of climate change in the UK. · £50,000 · 4 Mar 2024
- Residential Buildings Assumptions · £41,500 · 18 Jan 2024
- Early engagement notice - Risks to health and the health service due to extreme heat · 18 Jan 2024
- Early engagement notice - Heat risks to the urban environment and health · 17 Jan 2024
- Early engagement notice - Interventions for building economy-wide water resilience · 10 Jan 2024
- Early Engagement Notice - Assessment of climate risks to UK cold-supply chains · 13 Dec 2023
- Climate Change Risk Assessment 4 - Technical Report · £500,000 · 7 Dec 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ACAS27482 - MH Good Practice tender · UK SHARED BUSINESS SERVICES LIMITED · £69,730
- PS26168 - Audit of internet services · UK SHARED BUSINESS SERVICES LIMITED · £200,000
- Provision of Value of a Life Year Research (VOLY): Lot 4 Peer Review · DfTc - Department for Transport · £74,008
- Award of Effective ventilation guidance and practice to mitigate the indoor airborne transmission... · Scottish Government · £9,826
- Evaluation of Growth Gateway and Manufacturing Africa · Foreign Commonwealth and Development Office · £449,112
- PR 07 2026 Consultation and Engagement Research · Exeter City Council · £175,200
- Annual Awareness Survey and Stakeholder Sentiment Survey · Care Quality Commission · £62,188
- Provision of Accelerating AI-Enablement at the GCA · GOVERNMENT COMMERCIAL AGENCY · £98,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.