Wilmslow Park Weir
key details
| Value | £79,140 |
|---|---|
| Status | complete |
| Category (CPV) | 90700000 |
| Deadline | 4 Nov 2024 |
| Contract start | 2 Dec 2024 |
| Contract end | 31 Mar 2025 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-184998de-450d-4cea-9bbc-e9b20aaa4f17 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Fishtek Consulting | £79,140 | 27 Nov 2024 | active |
description
Wilmslow Park Large Weir is located on the River Bollin, southeast of the town of Wilmslow in East Cheshire, at grid reference SJ8567881137.
The weir is a two-staged weir, approximately 11m wide and 4m high. The weir is over 140 years old and appears to have been constructed for abstraction of water into a mill on the left bank. The mill race is disused and has been closed off for some time. The weir is constructed in large stone masonry with two vertical drops.
Just downstream of Wilmslow Park Large Weir is a smaller weir (Wilmslow Park Weir) at grid reference SJ8531981224, which is approximately 4m wide and 1.5m high.
The land is owned by Bollin Valley Partnership who have established ecological enhancements at the site and therefore we will be working with the Chesire East Council and Bollin Valley Partnership to deliver the project.
The Park is managed by the Bollin Valley Partnership, a collection of landowners (including Cheshire East Council) and conservational organisations, who oversee the management of green infrastructure.
The Mersey is a recovering migratory salmonid catchment, whose improvements are acknowledged in the Salmon Five Point Approach. Historically the catchment had a very productive salmonid fishery, and its potential to support future UK salmon stocks is significant.
In 2004, APEM delivered the report 'A Strategy for The Establishment of Sustainable Populations of Migratory Fish', on behalf of The Environment Agency. This document reviewed habitat information covering the entire Bollin sub catchment and developed a strategy for the re-introduction of salmon to the River Bollin to allow the establishment of self-sustaining populations.
Working upstream from the Manchester Ship Canal, all the weirs identified in the strategy up to Wilmslow Park Weir have either been removed or had a fish pass installed. Therefore, Wilmslow Park Weir is the current upstream limit for salmon on the River Bollin.
The aim is to complete surveys, appraisal and design updates (as appropriate) to deliver detailed design of weir removal for Wilmslow Park Weir and weir removal, weir modification or bypass for Wilmslow Park Large Weir. It is expected that this will be completed in two phases; Phase 1: Option Development and Phase 2: Detailed Design,
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 12 Dec 2024 | Award (award) | · | 47400fbe-c35c-431d-933a-81e1f4ab3bef-810329 |
more from Environment Agency
- YNE AOMR Lot 1 Asset Recon Skerne South Park Fish Pass Renovation · £46,798 · 27 Jul 2026
- WMD-PFR-Barton to New Holland Lot 2 · 3 Jul 2026
- YOR - CDF - Tidal Ouse Left Bank Saltmarshe - SOC-OBC (PD Contract) · £19,716 · 3 Jul 2026
- SSD - SE - Ventnor Coastal Defence Scheme (OBC-FBC) Ground Investigation Works · £132,683 · 2 Jul 2026
- Beckingham Moderation 2026 · £99,385 · 1 Jul 2026
- SW- DCIS- River Lemon, Copperhouse Gate and Portreath ECC PM - CCS LOT 1 · £368,411 · 1 Jul 2026
- Copperhouse Gate Works · £1,186,246 · 1 Jul 2026
- NW PFR Lot 2 Stockdalewath Installation · £350,000 · 1 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- The Provision of Ecology Services · Loughborough University
- Provision of Wastewater Quality Testing Service · Armagh, Banbridge & Craigavon Borough Council
- Biodiversity Net Gain (BNG) · NORTHUMBRIAN WATER LIMITED · £5,700,000
- SAMM (Strategic Access Management & Monitoring) for the Wealden Heaths Phase II Special Protection Area (SPA) · East Hampshire District Council · £432,000
- Production of seabird flight height distributions from at-sea laser rangefinder data · JNCC SUPPORT CO · £28,000
- Strategic Flood Risk Assessment and Water Cycle Study · Borough Council of Kings Lynn and West Norfolk
- Tender for the appointment of a consultant on behalf of the Wye Nutrient Management Board to review the Wye Catchment Management Plan 2019 and develop a new Wye Catchment Management Plan 2025 · Herefordshire Council
- Procurement for National River Flow Archive Peak Flows Dataset Maintenance · ENVIRONMENT AGENCY · £0
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.