description
The Rail Industry operates in a context that is undergoing rapid change shaped by external pressures including an increase in extreme weather events, growing demands on infrastructure and a shifting policy environment, such as Brexit. These changes present new risks and opportunities across the industry - especially those areas with a long-term planning cycle such as infrastructure. Locking in resilient infrastructure will protect value, secure Britain's railways and prepare the organisation for long-term success. It is imperative the rail industry further embed and adopt an approach to measure, manage and reduce carbon emissions associated with rail infrastructure developments.
First published in 2009, and updated and re-launched in May 2016 the Rail Sustainable Development Principles (accessible here) define what sustainable development means for the railway. For carbon, this means the industry has a need to focus on increasing our understanding of this and targeting opportunities to reduce the carbon and cost in new projects. This project will support the industry to help meet this vision through utilisation of existing data to support future projects to baseline, assess and ultimately reduce their carbon emissions (and cost!).
Currently there are 680 users and 82 projects within the Rail Carbon Tool. At this number of projects there is an opportunity to use the data within the tool to:
| a) | Identify capital carbon case studies. This could include case studies featuring: overall purpose/goal of the assessment, uses and design changes because of the output (especially those that demonstrate lower carbon/lower cost), boundaries of the assessment, quantification of the project and lifecycle, for example carbon hotspots, use of key performance indicator (i.e. kilograms (kg) of CO2e, m² gross internal floor area or km of rail), verification, PAS2080 |
| b) | Identify templates within those project's carbon assessment (or trees as they are known in the Rail Carbon Tool) that would be useful to others and can be validated to become generic template items to build on the number of rail templates within the tool (of which there are currently 562). |
- Project objectives
Engage and work with organisations (see examples in Table 2) and projects (see examples in Table 1) that have used the Rail Carbon Tool to make calculations to seek agreement to obtain access to their data and information to:
| 1. | Develop at least 5 case studies of best practice and/or guidance of projects that have used the Rail Carbon Tool. These would be able to demonstrate the work that the rail sector is undertaking to reduce capital carbon. As mentioned above these case studies could feature: |
| | overall purpose/goal of the assessment, |
| | uses and design changes because of the output (especially those that demonstrate lower carbon/lower cost), |
| | boundaries of the assessment and potential guidance for boundaries for other rail projects, |
documents
- https://www.contractsfinder.service.gov.uk/Notice/1819b7ff-c3f6-4b79-b6f2-d9c7cb15fc63 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/20561868-b401-42ed-9784-f6ddc21ff363 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/60d7c5ae-9279-46ed-ae5e-e0b9e05a105d , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Jan 2018 | Tender (tender) | · | 1819b7ff-c3f6-4b79-b6f2-d9c7cb15fc63-193124 |
more from RAIL SAFETY AND STANDARDS BOARD LIMITED
- T1305 - Codify the impact of professional driving policies and defining best practice guidance · 20 Apr 2022
- T1261 - The use of AI in the Context of Spoken Safety Critical Communications · 27 Jan 2022
- T1273 Optimising drivers' use of audible warnings in all potential warning scenarios · 24 Nov 2021
- T1244 Characterising the Pantograph and Overhead Contact System · 20 Jan 2021
- T1223-02 Wheelset Coating Systems and Good Practice Guidance · 26 Nov 2020
- T1210 ADHERE Sander quality and performance criteria framework · 25 Aug 2020
- T1219-02 RESILIENT: Anti-icing and de-icing mitigations for pantograph and Overhead Line Equipment · 29 Jun 2020
- T1214 DECARB: 21st Century DC electrification infill · 5 Jun 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Provision of Value of a Life Year Research (VOLY): Lot 3 Supplementary Empirical Research · DfTc - Department for Transport · £182,737
- Provision of Value of a Life Year Research (VOLY): Lot 2 Advice on the maintenance and application of the values · DfTc - Department for Transport · £90,190
- TANL3071 - Provision of Value of a Life Year Research (VOLY): Lot 1 Primary Research · DfTc - Department for Transport · £1,298,901
- SISAC OBC WP2/4 · NCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC WP1 · NCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC 2/4 · NCCC Operations Ltd T/A NCC - Innovating for Industry
- SISAC OBC WP2/3 · NCC Operations Ltd T/A NCC - Innovating for Industry
- W785b - A Public Realm and Transport Framework · DERBY CITY COUNCIL · £27,479
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.