Agecroft Prison Footbridge Painting Scheme (Technical and Highways Works Framework - Lot 4 - Structures and Bridges

Salford City Council Published 1 Aug 2022 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£135,000
Statuscomplete
Category (CPV) 45200000
Deadline9 Jun 2022
Contract start5 Sept 2022
Contract end25 Nov 2022
Procedureselective
SME suitableYes
OCIDocds-b5fd17-ea57fda8-73b3-4d7c-aff4-5d20c1cea902

Award

SupplierValueDateStatus
Coating Services Limited £113,200 31 Jul 2022 active

description

The Highway Structures, Bridge and Subway Lot (Lot 4) will include the following elements of work:

New construction could cover the following elements of work:

  • a)Construction of new highway road bridges.
  • b)Construction of new highway footbridges.
  • c)Construction of retaining walls.
  • d)Subways and culverts.
  • e)Construction of traffic sign gantries.

Works may include:

Site Clearance.

Earthworks.

Construction of drainage.

Planing and resurfacing.

Pavement construction.

Kerb and footway construction.

Structural concrete, steelwork and timber.

Waterproofing.

Brickwork, Blockwork and masonry.

Carriageway signs and lines.

Installation and improvement of street lighting.

Ducting and inspection chambers.

Planning and Supervision of utility diversions.

Installation of bridge parapet systems and vehicle restraint systems.

Installation of traffic signal equipment and liaison with TfGM UTC.

Installation of street furniture and traffic signs.

Landscaping.

Painting / protection against corrosion.

Repairs and reconstruction could include the following work:

Structural repairs to timber, steelwork and concrete, masonry and brickwork.

Strengthening works.

Bridge re-decking and re-surfacing.

Parapet repairs and footway protection.

Installation of vehicle restraint systems.

Re- tiling of subways.

Painting / Graffiti removal / protection against corrosion.

Improvements to Drainage.

Improvement to lighting.

Work may include:

Site Clearance.

Earthworks.

Construction of drainage.

Planing and resurfacing.

Pavement construction.

Kerbing and footway construction.

Structural concrete and steelwork.

Waterproofing.

Brickwork, Blockwork and masonry.

Carriageway signs and lines.

Installation and improvement of street lighting.

Ducting and inspection chambers.

Planning and Supervision of utility diversions.

Installation of bridge parapet systems and vehicle restraint systems.

Installation of traffic signal equipment and liaison with TfGM UTC.

Installation of street furniture and traffic signs.

Landscaping.

All material arising's that cannot be incorporated into the permanent works shall be disposed of offsite to a licensed tip using a grab wagon operated by a competent CPCS operator. A waste transfer note must be provided for each load removed from site

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
1 Aug 2022 Award (award) · 0cb0096c-acfc-42b1-978f-072ab22f64b5-559265

more from Salford City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.