SMG Racking Inspections
key details
| Status | active |
|---|---|
| Category (CPV) | 39151100 |
| Deadline | 5 Jul 2024 |
| Contract start | 1 Aug 2024 |
| Contract end | 31 Jul 2027 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-ea8eb819-0e6d-4242-bd02-41a0180b9c4f |
description
SMG wishes to appoint a supplier for inspection of racking and shelving. The company should be an approved SEMA (Storage Equipment Manufacturers Association) inspector or SARI. The inspections will be required at all the sites within SMG.
The below definition explains what SMG considers to be racking:
- oAny type of framework of fixed or adjustable design which supports a load without the use of shelves (e.g., pallet racking)
- oContains mechanical components/moving parts in the storage system (mechanical racking).
- oStillages
All other storage systems may be considered shelving or bookshelves.
To ensure certain types of shelving are suitable for purpose, SMG have also deemed there to be a category of enhanced inspection shelving. This shelving is defined as:
- oShelving which supports loads whereby one person could not comfortably lift the loads without assistance (based on manual handling guidelines) or the use of equipment such as ladders.
- oExtensive large shelving which supports a lot of material/stock
The service should be on an annual basis unless the inspection results dictate otherwise.
The appointed supplier will undertake a full asset verification during the first visit to each location, and throughout the contract, maintain an up-to-date asset list, adding and removing items as required. Access to the asset list, inspection reports, recommendations etc via a web portal/electronic system.
The supplier should be independent from any racking manufacturer and be able to inspect all the types of racking as outlined above.
The inspection should include all elements required under the relevant legislation, SEMA guidelines and best practices. In addition, identify if and where safe working load or SEMA notices are required, check existing signage for correct details and locations. Where the safe working load notices are missing, or the racking is historic in nature the safe load must be determined and notified to SMG.
Where defects are noticed during the inspection the report must highlight this along with a time period for the repair. Any defects leading to serious safety risk should be notified to the local Estates Team immediately along with the required actions. Where defects are noted, a quote should follow to undertake the repairs. SMG will not be obliged to act on this quote.
Some of the SMG sites are very large with asset locates across different buildings and numerous floors, the time and to travel within the site must be included.
Access to site will be facilitated by the local Estates Team, and all site attendance must be coordinated through them. The inspections will take place during normal business hours 07.00 - 19.00. Public areas are to be inspected outside of museum operational hours of 10.00 - 18.00. To enable this, a program needs to be developed for the inspections at each site. There must be flexibility for events, breakdowns, maintenance etc within the program as an ...
Additional information: You can view our tender documents and apply for the opportunity here: https://in-tendhost.co.uk/sciencemuseumgroup/aspx/Home
Is a Recurrent Procurement Type? : No
documents
- https://in-tendhost.co.uk/sciencemuseumgroup/aspx/
- https://www.contractsfinder.service.gov.uk/Notice/6f966914-5008-4b4d-8e5f-6c354ec160a4 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 14 Jun 2024 | Tender amendment (tenderAmendment) | · | 6f966914-5008-4b4d-8e5f-6c354ec160a4-759642 |
| 27 Jun 2024 | Tender amendment (tenderAmendment) | · | 6f966914-5008-4b4d-8e5f-6c354ec160a4-762731 |
more from Science Museum Group
- SIM Architect and Lead Designer for Wonderlab and Power Up - AWARD · 2 Dec 2025
- Flight Gallery Improvements - Graphics - AWARD · 1 Oct 2025
- ScM Flight Gallery - Lighting Upgrades - AWARD · 1 Oct 2025
- Locomotion Exit Surveys 2024-27 - AWARD · 23 Sept 2025
- NRM Building Regulations Principal Designer - AWARD · 27 Aug 2025
- NCC Consolidation Project: Manufacture and Supply of 200 Large Pallets - AWARD · 21 Aug 2025
- Disassembly and Removal of Existing Pallet Racking and Manufacture and Installation of Adjustable Pallet Racking in Hangar L1 - AWARD · 21 Aug 2025
- Horizons Gallery Graphic Designer - AWARD · 20 Aug 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Roller Racking · City of Bradford Metropolitan District Council
- Partial Design, Supply and Install of Specialist Mobile and Static Racking Systems for Art Collection · British Council · £350,000
- NWSSP Pushback Racking Bridgend · NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust) · £400,000,000
- GB-Horsham: TPPL Saxon Weald Homes Limited HCC Lot 6 - Racking for Up to 83 x LCVs (24085) · Saxon Weald Homes Limited · £249,558
- GB-Dorchester: TPPL Magna Housing HCC Lot 6 - Racking Requirement for up to 42 x Vehicles (25179) · Magna Housing Group Limited · £102,640
- GB-Scunthorpe: TPPL ONGO Housing HCC Lot 6 - Racking for Up to 110 x Vehicles (18929) · ONGO Housing · £488,461
- Workshop Storeroom Racking - AWARD · Cheshire Constabulary
- GB-Birmingham: Midland Heart HCC Lot 6 - Racking Requirement for up to 206 x Vehicles (24430) · Midland Heart Limited · £666,725
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.