key details

Statusactive
Category (CPV) 42160000 +5 more
RegionLondon
Deadline22 May 2018
Contract start16 Jul 2018
Contract end17 Aug 2018
Procedureopen
SME suitableNo
OCIDocds-b5fd17-e8dc7fa6-dfa4-4b99-a548-c6b3ab341f00

description

Goldsmiths University of London is based in New Cross in South East London and is home to the library building, also called the Rutherford Building. This is one of the main buildings of the campus with library facilities in operation 24 hours a day 7 days a week. The time allocated for this plant room strip out and installation is at a time that the library is in usage therefore a duty of care to noise is to be taken very seriously.

The College is inviting contractors to bid for the M&E Refurbishment of the primary LTHW system and HWS located in the plant room on the top floor of the Library. The full strip out of the library primary side is required with some equipment to be retained as highlighted in this document and associated drawings. Following strip out, boilers, heat exchangers and ancillary equipment is to be supplied, installed and commissioned.

Additional information:

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
1 May 2018 Tender (tender) · a30bae93-3d77-42d5-9b60-f4e81cb96f38-213971

more from HE Portal

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.