Camel Footbridge Wadebridge - Maintenance & Repair Works
key details
| Value | £400,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 +1 more |
| Deadline | 15 Sept 2021 |
| Contract start | 11 Oct 2021 |
| Contract end | 23 Dec 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-e85ab479-b7e6-4993-a75f-0329cd029d84 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Taziker Industrial Ltd | £418,990 | 7 Dec 2021 | active |
description
Corserv on behalf of Cormac Solutions Ltd wish to appoint a suitably experienced and qualified contractor to undertake major maintenance works on the cable stay Camel footbridge in Wadebridge safeguarding the structure for continued use, under an NEC Option A ECS (Engineering & Construction Subcontract).
*Scope of Works
The Camel Footbridge carries the maintainable public footpath over the River Camel between Egloshayle Road and Wadebridge Town centre. The structure consists of a two span cable stayed suspension bridge. The total length is 62m with a main span of 40m. The bridge tower support is founded within the River bed and extends 16m high above the deck. The bridge consists of a steelwork deck frame and tower with timber decking and aluminium balustrading. The deck is suspended from 8 pairs of steel cables (16 cables and 32 connectors).
The bridge steel and timber elements were previously repainted and treated in 2009, see included document Camel Footbridge Construction Report, Maintenance Manual and Health and Safety File (Report No: S3444/HB814/Con1). The Principal Inspection (Report ref: UU6311/CFB/JANUARY 2019 - Issue 1) undertaken in 2018, highlighted a number of defects that require remedial work.
The project aim is to undertake major maintenance works on the cable stay Camel footbridge in Wadebridge safeguarding the structure for continued use.
Please see location map, Principal Inspection report, As-built drawings and other Site information in the folder called SI
Please see Works information in the folder titled WI
The proposed works include provision of all staff/labour/resources necessary to design, supply and install the following :-
In accordance with the document titled 'PCI WI - Camel Footbridge Rev 1.pdf' and section 3.0 Works Information) ;
- 1. Remove, replace and correctly tension all 16 existing cables, 16 tensioners and 32
connectors (including rigging screws).
- 2. Re-paint the areas of steel highlighted in the painting and cleaning schedule provided to the
required paint specification, see Appendix E - Specification.
- 3. The existing timber deck elements; Balau timber deck planks (50x100mm), timber
support/facing panels (50x300mm) on both elevations and packer boards (50mm thick), will be
replaced with rot-resistant glass fibre anti-slip boards, designed to look like the existing timber
handrails. The proposed deck is to be designed by the subcontractor in accordance with the relevant parts of the Eurocodes and meet the relevant requirements of DMRB CD 353. Design to be undertaken in accordance with Works Information in the PCI document and to allow for issue of design and drawings to Cormac for approval. This is to be shown on the tenderers programme and reflected in their Activity Schedule.
To access the online question template and supporting documents, express an interest and then click the"start my response" button
documents
- https://procontract.due-north.com/Advert?advertId=754de244-59fb-eb11-810d-005056b64545 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/00f7c897-d37f-486a-be2d-1e4c4863a3c0 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/518ca5c7-6b6b-46db-a2fa-fdd0bf80f018 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/563d87f9-f341-4ec1-8563-a6b8847de7db , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Feb 2022 | Award (award) | · | 956e3e90-ffde-4eb9-be06-095c206022c7-508319 |
more from Corserv Limited
- Poundstretcher Refurbishment, Penzance, Design, Supply and Install Lift and Platform Lift · £100,000 · 7 Nov 2024
- Poundstretcher Refurbishment, Penzance, Structural Steelworks · £50,000 · 6 Nov 2024
- Langarth Village Phase 1 Supply & Installation of Steel & Timber Handrails · £50,000 · 4 Oct 2024
- Langarth Garden Village - Allotment Building · £150,000 · 3 Oct 2024
- 1-8 Riverside View Saltmill Saltash - Demolition · £150,000 · 18 Sept 2024
- 10 Pendower Road Veryan- Major Void Works · £185,000 · 5 Sept 2024
- 1 Langreek Bungalows Polperro - Blockwork Boundary Wall · £100,000 · 22 Aug 2024
- Trevithick Manor Farm S278 - Block Paving Works · £100,000 · 15 Aug 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ENQ1310 - 2026-27 Structures Programme Assistance · DERBY CITY COUNCIL · £25,000
- CPU 7199 - Newstead Abbey MEND repair programme Quantity Surveyor · Nottingham City Council · £38,665
- CPU 7275 - Newstead Abbey MEND Repair Programme Conservation Accredited Lead Advisor · Nottingham City Council · £68,996
- Tickford Park Primary School SEND Unit · Milton Keynes Council · £101,188
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- L9-102 ATE Monument Roundabout · North Lincolnshire Council · £198,564
- 26160 - Changing Rooms - AWARD · Telford and Wrekin Council · £21,137
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.