Bridgewell Supported Living Residential Accommodation Project

Bracknell Forest Borough Council Published 20 Sept 2022 Contracts Finder

key details

Statusactive
Category (CPV) 45210000
RegionSouth East
Deadline26 Sept 2022
Procedureselective
OCIDocds-h6vhtk-0361bd

description

Bracknell Forest Council (“the Council”) are seeking to develop accommodation and support for an ageing population of people with learning disabilities, built around demand, need and best practice and informed by the market and community. The site is located at 10 Ladybank, Bracknell RG12 7HA off Birch Hill Road and is situated close to a medical practice, shops, community centre and a primary school.

The site is accessed via Ladybank Road, a no-through road. The surrounding area is predominantly residential. Temporary access for construction may also be possible from Leppington Road (north of the site), subject to seeking Highways consent.

Part of the site slopes from west to east, with the existing building situated on a levelled surface. The proposed new building is planned to remain around the same level of the existing building. For further details, please refer to the IBI architect’s RIBA Stage 2 report.

The Bridgewell Supported Living project will provide four 5-bedroom units and is based on a two-storey new build accommodation, i.e. the existing building will be demolished. The scheme will achieve BREEAM Excellent sustainability and secure by design rating. The design is based on Housing our Ageing Population Panel for Innovation (HAPPI).

The works involve the following:-

  1. Complete RIBA Stages 3 and 4 design under a PCSA.
  2. Site perimeter hoarding.
  3. Isolation and capping of existing services.
  4. Asbestos removal.
  5. Soft strip.
  6. Full demolition of the existing buildings on site and adjust levels to the site.
  7. Construction of a new two storey supported living residential accommodation with a roof garden. BREEAM Excellent target.
  8. Landscaping works including access, car parking, pedestrian routes, garden & planting works and making good.
  9. Adjustment of hoardings and boundary.

This project will be developed under a Design and Build (D&B) process i.e. the contract sum for the Main Works Contract (the “Contract Sum”) will be arrived at in two stages. The intention is that the selected Contractor will initially fulfil the design for RIBA stages 3 and 4 under a Pre-Construction Services Agreement and ultimately be appointed under a lump sum form of contract (JCT Design and Build 2016 as amended by The Schedule of Amendments)

(the “Main Works Contract”). A summary of this process is set out in the Combined Invitation to Tender.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
22 Aug 2022 Contract notice (F02) Earlier regulations 023361-2022
20 Sept 2022 Corrigendum (F14) Earlier regulations 026156-2022
20 Sept 2022 Tender (tender) · 79e91072-95db-4059-8394-04fba32f0611-572733

more from Bracknell Forest Borough Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.