Lockwood & Whitehead Buildings LV Panel Replacement
key details
| Value | £250,000 |
|---|---|
| Status | active |
| Category (CPV) | 45317300 |
| Region | London |
| Deadline | 26 Aug 2016 |
| Contract start | 9 Sept 2016 |
| Contract end | 23 Dec 2016 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-e5a4b10a-adc9-11e6-9901-0019b9f3037b |
description
Lockwood and Whitehead Buildings LV Panel Replacement Project
Tender Ref: GOLD0402
Goldsmiths university of London would like to invite Contractors to submit tender for the replacement of various distribution cubicles for a single distribution board in each of two buildings; the Lockwood Building and Whitehead Building. There is also a cost option for replacement of the sub-main cables and distribution boards served by these cables in the Whitehead Building.
This procurement project will be conducted through the Intend e-tendering portal via a competitive tender process. Log onto the Goldsmiths Procurement portal In-Tend https://in-tendhost.co.uk/he to participate in this project, access documents and receive instructions on the process.
Additional information: Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/he/aspx/
documents
- https://in-tendhost.co.uk/he/aspx/ , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/95a45aa8-c964-45e4-9485-1a79a2c3fd53 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2016 | Tender (tender) | · | 95a45aa8-c964-45e4-9485-1a79a2c3fd53-102662 |
more from HE Portal
- E-Portfolio Assessment Tool · 14 Oct 2024
- 013/2024T Fire Systems Term Service Contract · 7 Jun 2024
- 001/2024T Student Accommodation Cleaning · £2,000,000 · 26 Jan 2024
- 024/2022T Managed Laundrette - AWARD · 4 Dec 2023
- 031/2023 Replacement of Access Control System · 15 Sept 2023
- 028/2023T EPOS System · 21 Aug 2023
- 012/2023 Student Accommodation Re Decoration - AWARD · 11 Jul 2023
- 018/2023T Health Simulated Manikins · £2,000,000 · 27 Jun 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- CA16854 - Further Competition via NHS Framework SBS10166 - Tender 26/2025 Newry Mourne & Down District Council Fleet EV Charger Installations · Newry, Mourne and Down District Council (NMD)
- Pilgrim Substation Stage 1 design · United Lincolnshire Teaching Hospitals NHS Trust · £100,000
- Electrical Installations for Pilgrim Theatres Chiller · United Lincolnshire Teaching Hospitals NHS Trust · £70,000
- TEC Partnership - Replacement Switch Gear and Associated Cable Works · TEC Partnership · £65,000
- DHC DH1334 Westhaven Hospital Replacement Electrical Panel Board · Dorset HealthCare University NHS Foundation Trust · £62,319
- YAS 125 2024_25 Selby Ambulance Station Remodel · Yorkshire Ambulance Service NHS Trust · £455,726
- BHC Compound PV Scheme, Banjul, The Gambia · Foreign Commonwealth and Development Office
- AA-410-24-TW (ES) Urgent Replacement of Uninterrupted Power Supply Equipment, University Hospital Crosshouse · NHS Ayrshire & Arran
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.