A66 - Sheet Piles
key details
| Value | £5,000 |
|---|---|
| Status | active |
| Category (CPV) | 44212410 |
| Deadline | 6 Mar 2026 |
| Contract start | 20 Apr 2026 |
| Contract end | 24 Apr 2028 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-e39f13c2-839c-4446-9628-de54c20a7117 |
description
- Overview
The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b.
- Detailed Scope
- Supply of Materials
The Contractor shall supply:
- Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements.
- 2.2Installation of Sheet Piles
The Contractor shall undertake:
| • | Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. |
| • | Removal of sheet piles upon completion of works. |
- Associated Works
The Contractor shall complete associated activities including:
| • | Pile guide frames |
| • | Dewatering screens |
| • | Structural support components |
- Pre Construction & Site Activities
Activities include:
| • | Mobilisation and site establishment |
| • | Setting out |
| • | QA testing |
| • | Preparation of record drawings and certification |
- Coordination Requirements
The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________
- Standards & Compliance
All works must be carried out in accordance with:
| • | BD 21/01 |
| • | National Highways Specification |
| • | Relevant BS/EN/Eurocode standards |
| • | CDM Regulations |
________________________________________
- Key Supplier Requirements
The Contractor must:
| • | Demonstrate capability to manage CDM and SHES risks |
| • | Provide method statements, vibration and noise mitigation plans |
| • | Coordinate closely with Temporary Works Designers |
| • | Collaborate with the Balfour Beatty site and engineering teams |
| • | Submit all required QA documentation, including testing and certification evidence |
________________________________________
- Procurement & Delivery Model (Informational Context Only)
A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value.
(You can exclude this section if you only need the technical scope.)
________________________________________
- Risks & Mitigation - Contractor Responsibilities
The Contractor shall support risk management in areas including:
| • | Early award and resource confirmation to reduce over commitment risks |
| • | Managing vibration and settlement risks through pre condition surveys and real time monitoring |
| • | Mitigating design or construction clashes through integrated design reviews and 3D coordination |
| • | Minimising traffic management delays via advanced planning and flexible work slots |
| • | Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms |
________________________________________
- Deliverables
The Contractor shall provide:
| • | Complete installation of specified sheet piling works |
| • | Full QA documentation including test results and certification |
| • | As built / record drawings |
documents
- https://www.contractsfinder.service.gov.uk/Notice/d01423b9-4a9c-4c91-805d-4e080514de72 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 20 Feb 2026 | Tender (tender) | · | d01423b9-4a9c-4c91-805d-4e080514de72-885018 |
more from BALFOUR BEATTY CIVIL ENGINEERING LIMITED
- A66 - Security package · 2 Jun 2026
- Balfour Beatty - Roads North of the Thames-LTC - Sheet Pile Walls · £1,500,000 · 21 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Reinforced Soil Walls · £2,500,000 · 13 May 2026
- Balfour Beatty - Roads North of the Thames-LTC - Pavement Survey Works · £50,000 · 13 Mar 2026
- Balfour Beatty - Roads North of the Thames-LTC - Demolition Works · £100,000 · 23 Feb 2026
- A66 - FRC · £5,000 · 20 Feb 2026
- Balfour Beatty - Roads North of the Thames-LTC - Soil Testing and Agricultural Land Classifications Surveys Works · £50,000 · 18 Nov 2025
- A66 - Advanced Works Concrete · £30,000 · 5 Nov 2025
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Horning Marshes 24hr Mooring - Re-piling · Broads Authority · £90,000
- Neatishead Staithe 24hr Mooring - Re-piling · Broads Authority · £200,000
- RfQ for sheet piles to retain 440 metre long footpath · Hart District Council · £50,000
- BBV HS2 MWCC North - Sheet Piling · BIP SOLUTIONS LIMITED · £1
- St Benet's Abbey 24 hour mooring refurbishment · Broads Authority · £80,000
- Deptford Sheet Piling · BIP SOLUTIONS LIMITED
- Design & Build of New Sheet Piling Newquay Harbour North Pier · Cornwall Council · £500,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.