Burnwood Community School Kitchen Extension Project
key details
| Value | £450,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 +3 more |
| Deadline | 6 Nov 2024 |
| Contract start | 2 Dec 2024 |
| Contract end | 31 Aug 2025 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-dc521243-a085-48f6-88c0-e6d323ec8224 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Seddon Construction Ltd | £450,000 | 23 Dec 2024 | active |
description
Stoke-on-Trent City Council has allocated some funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and accommodates 6 adults along with a variety of kitchen appliances.
An extension is required due to the large increase in the school's pupil population. In 2011 the kitchen provided around 150 meals however due to the vast increase in pupil numbers, the school is now providing upwards of 400 meals per day for pupils from Nursery to Year 6. The extension design is expected to comply with BB103.
The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council is now looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.
The contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings.
The consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.
The City Council has allocated a total budget of £450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.
The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period as part of the PCSA process.
At the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction.
documents
- https://www.contractsfinder.service.gov.uk/Notice/88ea9dc5-5cfc-446c-b04e-36c4d20856fd , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 4 Oct 2024 | Tender (tender) | · | 88ea9dc5-5cfc-446c-b04e-36c4d20856fd-791345 |
| 2 May 2025 | Award (award) | · | 3a6108e5-273f-42fa-9e24-fae0e834d4de-843581 |
more from Stoke-on-Trent City Council
- Fully-funded photo-voltaic solution for the UK public sector · 12 Dec 2025
- (DPS 7239) Stoke-on-Trent City Council - Appointment of contractor to support Delivery of Warm Homes: Local Grant · £3,070,800 · 26 Nov 2025
- ESPO Consultancy Framework - Cared for Children Consultancy Programme (CAFS/2025/294) · 28 Aug 2025
- Educational Psychology Assessment Delivery · £1,280,000 · 18 Aug 2025
- Owners Engineer for the Operation and Maintenance of the Hanford Energy Recovery Facility · 24 Jun 2025
- Community Care and Support Contract (Home Care, Extra Care, Social Opportunities and support for Unpaid Carers) · £188,831,580 · 8 Apr 2025
- Family Support Co-ordinators Service · £1,200,000 · 31 Mar 2025
- The Crescent Academy · £275,000 · 19 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ENQ1310 - 2026-27 Structures Programme Assistance · DERBY CITY COUNCIL · £25,000
- CPU 7199 - Newstead Abbey MEND repair programme Quantity Surveyor · Nottingham City Council · £38,665
- CPU 7275 - Newstead Abbey MEND Repair Programme Conservation Accredited Lead Advisor · Nottingham City Council · £68,996
- Tickford Park Primary School SEND Unit · Milton Keynes Council · £101,188
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- L9-102 ATE Monument Roundabout · North Lincolnshire Council · £198,564
- 26160 - Changing Rooms - AWARD · Telford and Wrekin Council · £21,137
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.