gvtcx

Burnwood Community School Kitchen Extension Project

Stoke-on-Trent City Council Published 4 Oct 2024 Contracts Finder

key details

Value£450,000
Statuscomplete
Category (CPV) 45000000 +3 more
Deadline6 Nov 2024
Contract start2 Dec 2024
Contract end31 Aug 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-dc521243-a085-48f6-88c0-e6d323ec8224

Award

SupplierValueDateStatus
Seddon Construction Ltd £450,000 23 Dec 2024 active

description

Stoke-on-Trent City Council has allocated some funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and accommodates 6 adults along with a variety of kitchen appliances.

An extension is required due to the large increase in the school's pupil population. In 2011 the kitchen provided around 150 meals however due to the vast increase in pupil numbers, the school is now providing upwards of 400 meals per day for pupils from Nursery to Year 6. The extension design is expected to comply with BB103.

The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council is now looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.

The contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings.

The consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.

The City Council has allocated a total budget of £450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.

The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period as part of the PCSA process.

At the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
4 Oct 2024 Tender (tender) · 88ea9dc5-5cfc-446c-b04e-36c4d20856fd-791345
2 May 2025 Award (award) · 3a6108e5-273f-42fa-9e24-fae0e834d4de-843581

more from Stoke-on-Trent City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.