Highways Works on A171

North York Moors National Park Authority Published 24 Apr 2018 Contracts Finder

key details

Value£15,000
Statusactive
Category (CPV) 45233000 +1 more
RegionNorth East
Deadline31 May 2018
Contract start11 Jun 2018
Contract end22 Jun 2018
Procedureopen
SME suitableYes
OCIDocds-b5fd17-c9e9a813-3c82-43f2-a08f-95c593d80117

description

Highways Verge Works

North of A171

Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol. 6, S3, part 5, sect. 9

Lined with geotextile and surfaced with 150mm compacted type 1 aggregate and finished with a compacted 25mm layer of 6mm- dust.

Install drainage provision to prevent surface water discharging onto the highway

Extension of tarmac area and extension of dropped kerb from field access to crossing area (approx. 4m x 1m)

Crossing to be constructed in accordance with Standard Detail B4 and E6W

Existing highway drainage grip relocated downhill of the proposed crossing

Surface levelling along bridleway route, relocation of stone mound

South of A171

Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol. 6, S3, part 5, sect. 9

Lined with geotextile and surfaced with 150mm compacted type 1

aggregate and finished with a compacted 25mm layer of 6mm-dust.

Provision to prevent surface water discharging onto the highway

Installation of 5m of dropped kerb to the highway surface

Crossing to be constructed in accordance with Standard Detail B4 and E6W

Ancillary Works

Fencing

Erection of approximately 150m additional stock fence (15cm x 15cm uprights centred at 1.5m) as shown on plan 2

Gates

Installation of 1 no. 5'6ft bridle gate and 2 no. 12ft field gate and side rails to leave stock proof at location shown on plan 2 Road Surfacing

Installation of a 10m wide band of high friction surfacing to HD37 (DMRB 7.5.2) the width of the carriageway (similar colour to the carriageway)

Signage

Erection of 2 no. triangular warning signs to be erected to warn drivers eastbound and westbound of the crossing point to DMRB Volume 8 Section 2 Part 2 (TD 26/17)

Dry Stone Wall

Dismantle and rebuild approximately 10 m of Dry Stone Wall plus supply stone for and construct an additional 10m of stone wall in accordance with plan 2 Spoil Management

Excess spoil to be relocated to Skelder top car park and used to re-profile existing bunds

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
24 Apr 2018 Tender (tender) · b92b52e2-8663-49fa-9949-da7275fec493-212628
6 Jun 2018 Tender (tender) · 52a48395-a89e-4c31-8472-862774fc46bc-220479

more from North York Moors National Park Authority

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.