Research study into impact of mine water discharges to coastal environments
key details
| Value | £5,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73000000 |
| Deadline | 26 Oct 2015 |
| Contract start | 8 Nov 2015 |
| Contract end | 31 Dec 2015 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-da0296ff-adc8-11e6-9901-0019b9f3037b |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Marine Biological Association | £5,205 | 3 Nov 2015 | active |
description
The Coal Authority requires a research study to be undertaken to understand the impacts of untreated minewater discharges with specific regard to water quality and marine ecology. The initial study will comprise a desk-based literature study, gap analysis and recommendations for further research requirements.
Depending on the findings of this initial study, there may the opportunity to participate in subsequent studies as part of later work packages, potentially including field trials.
The aim of this project is to identify potential impacts of minewater discharges to the marine environment and provide recommendations on sustainable iron loads that can be discharged without causing significant adverse effects.
The scope of this research study is outlined below:
1- Summarise relevant environmental conditions of the proposed discharge locations. This summary should include, for example, climate, tidal regimes and expected ecology.
2- Undertake a desk based review to identify existing research on impacts from discharges with high metal loadings, with specific regard to iron, to the marine environment. This review should be relevant to the environmental conditions identified in Task 1.
3- Summarise available data for impacts to the marine environments with different environmental conditions from those identified in Task 1 and provide an assessment of how these impacts may relate to the environmental conditions identified in Task 1.
4- If sufficient data is available provide a quantitative recommendation on a sustainable iron load that can be discharged to the marine environment without significant adverse effects.
5- Where sufficient data is not available to complete Task 4 undertake a gap analysis to highlight any further data requirements. This analysis should be used to increase understanding on impacts of discharges of mine water discharges to marine environment identified in Task 1.
6- Based on the findings from Task 5 provide recommendations on whether or not a field study for specific data is required.
7- Where Task 6 highlights the need for a field study provide a detailed scope of works that will address the overall aim of this study should be developed. This scope should provide (as a minimum) details on:
a.Water quality determinands, sampling frequency and duration,
b.Ecology survey timings, frequency and duration,
c.Sediment sampling determinands, sampling frequency and duration,
d.Sampling locations, this should include control and impacted sites,
e.Sampling methodology,
f.Health and safety considerations
g.Identifications of risks and appropriate mitigation measures
8- Preparation of technical reports
a.Draft report summarising results from the literature review, gap analysis and if required scope of works for further work. This should be submitted for comment four weeks after project award.
b.Submission of final report two weeks after receipt of comments.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 5 Oct 2015 | Award (award) | · | ocds-b5fd17-da0296ff-adc8-11e6-9901-0019b9f3037b-76050-ca00-17--51208 |
more from The Coal Authority
- Board Management Tool Software · £63,180 · 29 Jun 2026
- Nent Haggs Compound Reinstatement · £242,254 · 3 Jun 2026
- NEC4 ECC Project Manager, ECC Supervisor, Commercial Manager & Environmental Clerk of Works (ECoW) for the Dylife project · 1 Jun 2026
- Employee Safety App & Devices · £57,969 · 28 Apr 2026
- Battery Energy Storage Systems (BESS) · £296,929 · 18 Mar 2026
- Cisco Umbrella Insights & Secure Endpoint · £41,446 · 16 Mar 2026
- Hydrogeological Conceptualisation and Environmental Risk Assessment · £8,320,254 · 5 Mar 2026
- Conference Room Audio Visual Equipment · £85,000 · 3 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ACAS27482 - MH Good Practice tender · UK SHARED BUSINESS SERVICES LIMITED · £69,730
- PS26168 - Audit of internet services · UK SHARED BUSINESS SERVICES LIMITED · £200,000
- Provision of Value of a Life Year Research (VOLY): Lot 4 Peer Review · DfTc - Department for Transport · £74,008
- Award of Effective ventilation guidance and practice to mitigate the indoor airborne transmission... · Scottish Government · £9,826
- Evaluation of Growth Gateway and Manufacturing Africa · Foreign Commonwealth and Development Office · £449,112
- PR 07 2026 Consultation and Engagement Research · Exeter City Council · £175,200
- Annual Awareness Survey and Stakeholder Sentiment Survey · Care Quality Commission · £62,188
- Provision of Accelerating AI-Enablement at the GCA · GOVERNMENT COMMERCIAL AGENCY · £98,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.