Instrumentation and Monitoring (I&M)
key details
| Value | £30,000 |
|---|---|
| Status | active |
| Category (CPV) | 31682210 |
| Region | East of England |
| Deadline | 11 Aug 2023 |
| Contract start | 8 Nov 2023 |
| Contract end | 8 Nov 2024 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-d7299e87-c0e8-4143-b4d8-d859bba48f09 |
description
Skanska is preparing to deliver the A428 Black Cat to Caxton Gibbet Improvement Scheme on behalf of National Highways. This package is for supplying instrumentation and monitoring solutions as follows;
Measurement of settlement is required at selected earthwork locations as outlined in the Series 600 Numbered Appendices for Earthworks document and scheme specific drawings. Within the series 600 numbered appendices the locations of the instrumentation are shown in Table 6/12.1 and Drawings in Table 6/3-1. The instrumentation shall comprise magnet extensometers and surface settlement monitoring points.
The Contractor shall provide, install, protect and maintain for the duration of the contract the instrumentation indicated in Table 6/12-1 and described in Appendix 6/12. The Contractor shall provide the equipment necessary to monitor the instrumentation. Termination of earthworks monitoring before the end of the contract is only acceptable with the agreement of the Design Organisation.
The instrumentation shall be installed under the supervision of the Design Organisation, by the appointed Instrumentation Contractor. At least two weeks prior to the installation the Contractor shall provide a method statement giving details of the proposed instrumentation and its installation to the Design Organisation. Standard Details of the monitoring points can be found on drawing HE551495-MOTG-HGT-CONWI_CONW-DE-CE-06506.
Instrumentation shall be installed as soon as practical after the earthworks are constructed to full height. The extensometers will be constructed within a borehole, formed from the finished surface level of the earthwork. Settlement monitoring points shall be constructed at the surface of the finished earthwork.
l instrumentation shall have its head level and position monitored to allow potential adjustments, to be agreed with the Design Organisation. Each instrument shall be adequately marked with its reference number.
You will be invited to complete our Request for Information (RFI), conducted on our Oracle Cloud platform. The RFI will only take between 10 & 15 minutes to complete, at the end of the process you will be told if you have been shortlisted. If you have you will be invited to respond to the full Request for Quotation (RFQ), which will be issued shortly after the RFI closes.
Please see attached the link with a project overview - https://nationalhighways.co.uk/our-roads/a428-black-cat-to-caxton-gibbet/
To respond to our expression of interest request, please see this link which will take you to a Microsoft form - https://forms.office.com/r/nTQdtVFTiH
documents
- https://forms.office.com/r/nTQdtVFTiH , eligibilityCriteria
- https://www.contractsfinder.service.gov.uk/Notice/b7ae853c-93f2-4694-8c77-e627b5cc5f2d , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 Jul 2023 | Tender (tender) | · | b7ae853c-93f2-4694-8c77-e627b5cc5f2d-661492 |
more from SKANSKA CONSTRUCTION UK LIMITED
- 1100.03 V-Channel/Slipform · £1 · 16 Jun 2026
- Lower Thames Crossing - Kent Roads - CCTV Drainage Survey Services · £500,000 · 4 Jun 2026
- Lower Thames Crossing - Kent Roads - Concrete Pumps · £400,000 · 6 May 2026
- Lower Thames Crossing - Kent Roads - Pond Lining · £500,000 · 6 May 2026
- Lower Thames Crossing - Kent Roads - Vegetation Clearance · £2,000,000 · 2 Apr 2026
- Lower Thames Crossing - Kent Roads - Site Security · £500,000 · 23 Mar 2026
- Lower Thames Crossing - Kent Roads - Stage 1 works - Compound Kerb Install · £500,000 · 11 Feb 2026
- Lower Thames Crossing - Kent Roads - Stage 1 works - Compound White Lining · £500,000 · 11 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Plowright and Brooksby CETP BETP Calibrations Service Contract · THE PIRBRIGHT INSTITUTE
- Supply of Spectroradiometer · Royal Botanic Garden Edinburgh · £72,680
- Rechargeable Board / Tag for Deployment on Skate and Rays · University of St Andrews · £79,000
- Supply of Wireless Instrumentation and Control System · UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITED · £55,000
- Instrumentation Cancellation Notice · Southern Water Services Limited · £23,358,170
- Replacement Instrumentation - Hydrocarbons · ENVIRONMENT AGENCY
- Voice Alarm (VAPA) & Emergency Voice Communications (EVC) Replacement BFI IMAX · British Film Institute · £100,000
- NDA 7 Spares · NRS Dounreay · £68,326
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.