Mottram Road Retaining Wall (633N) Refurbishment and Associated Work Scheme 2017

Tameside Metropolitan Borough Council Published 12 Jan 2017 Contracts Finder

key details

Value£220,000
Statusactive
Category (CPV) 44000000 +1 more
RegionNorth West
Deadline17 Feb 2017
Contract start27 Feb 2017
Contract end21 Apr 2017
Procedureopen
SME suitableNo
OCIDocds-b5fd17-d58f3eb5-63b5-4e2a-b619-49848effb924

description

Site 1 - Mottram Road Retaining Wall (633N) Mottram Road Retaining Wall (633N) is a 154m long masonry wall that acts as a boundary wall between the A57 Mottram Road and an adjacent vegetated embankment on the bank of Godley Brook. The land behind the wall is owned by Tameside MBC. The work is to ideally be undertaken before March 2017 to avoid the bird nesting season from November to March inclusive. Site 2 - Walkerfold Culvert (015) Walkerfold Culvert carries Werneth Brook from south to north beneath Mottram road A57 Hyde. The culvert comprises three types of construction, from the inlet; Ch 0 -16.825m comprises a 900mm Circular Brick Culvert, Ch.16.825-61.35m comprises a brick arch culvert of varying dimensions, Ch. 61.35m - 67m comprises stone slabs. The culvert has a formed stone invert throughout its length. A CCTV investigation has noted several areas of flattening of the arch section, including beneath the carriageway

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
12 Jan 2017 Tender (tender) · 6c4f365a-b2fe-424e-8ed5-2576563b5768-124781

more from Tameside Metropolitan Borough Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.