gvtcx

Dover -Control Panel Upgrade

MCA - Maritime and Coastguard Agency Published 16 Sept 2021 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£25,543
Statuscomplete
Category (CPV) 71310000
RegionSouth East
Deadline25 Jul 2021
Contract start26 Jul 2021
Contract end2 Aug 2021
Procedureselective
SME suitableYes
OCIDocds-b5fd17-d4e0f6a6-f1e2-4a02-a46e-03aed8891dbc

Award

SupplierValueDateStatus
Building ManagementSolutions Integrators Ltd £25,543 25 Jul 2021 active

description

The Control Panel scope of work which we propose to undertake is as follows:1. Design, manufacture and delivery of 1x form 2 BMS Control Panel. 2. Fitting and wiring of free issue Controller, displays, modules and network equipment. We have allowed to upgrade the existing Trend obsolete IQ2 Series control with the latest Trend IQ4e controllers. 3. To supply and install a new Trend IQView4 display panel so that settings can be changed locally from the front of the new control panel. 4. Factory Inspection & Testing of control panels. 5. Documentation & certification package. Panel changeover scope of work which we propose to undertake is as follows:1. Isolate, test and make-safe to MCC and control enclosure.

  1. Disconnect existing cabling from both, retain the MCC gland plate if any cables cannot be re-glanded. 3. Mount new combined Form 2 MCC/Control enclosure in position vacated by the old MCC. 4. Allowance for new panel is 20x drives/feeds & 41x points (based on the supplied panel drawings and load list) 5. Divert existing control cabling to new panel (some cabling may need a small JB, included). 6. Re terminate all. 7. Existing field cablingassumed suitable for re-use. 8. Existing sensors and control devices to be retained. 9. Existing feed to be reused, assumed as sufficient capacity. 10. Dispose of old panels via a registered waste contractor. 11. Issue minor works cert. BMS Commissioning1. To create energy efficient software associated with the existing mechanical plant. 2. Point to Point check of the existing controls cables. 3. Download the new software into the new controller. 4. Re commission of the BMS controls. 5. Set up IQView4 on panel. 6. To commission, handover and provide documentation relating to the completed installation.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
16 Sept 2021 Award (award) · 0c8540c8-f6d8-49af-a8f6-6b04487aebb2-469136

more from MCA - Maritime and Coastguard Agency

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.