CP1828A-19 SW Exeter HIF - A379 Eastern Junction
key details
| Value | £2,600,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45233120 |
| Region | South West |
| Deadline | 18 May 2020 |
| Contract start | 6 Jun 2020 |
| Contract end | 1 Apr 2021 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-d2b241d1-af78-4d8a-b544-bd3f530437bf |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Alun Griffiths (Contractors) Ltd. | £2,163,841 | 23 Jun 2020 | active |
description
The overall objective of this scheme is to improve the accessibility of the A379 for all type of users: pedestrians, cyclists and motorists, between the Devon Hotel roundabout and the Sannerville Way roundabout, Exeter, prior to major development planned to the south west of Exeter. (UK Ordnance Survey grid reference SX 93217 89154). At present, this section of the A379 is a 4-lane single carriageway with limited facilities for pedestrians/cyclists. There are no crossing facilities near the Sannerville Way roundabout and a narrow shared use path on the south side of this road. The proposal seeks to introduce a new toucan crossing on the approach to the Sannerville Way roundabout to connect the south side of the A379 with the existing shared use path on Bridge Road and Matford Marsh. The existing shared use path on the A379 will also be widened where possible. Furthermore, a new signalised junction will be created with a new side road to the south of the A379 which will provide access to the proposed development area. The elements of work included in this phase of the scheme are, but not limited to: • Site Clearance • Earthworks • Drainage Works • Introduction of a staggered toucan crossing. • Modification and widening, where possible, of the existing shared use paths. • Realignment of the carriageway. • Resurfacing of the carriageway. • Road markings and signage. • Introduction of a new signalised junction. • Introduction of a new side road with shared paths and a staggered toucan crossing. • Removal of a layby. • Vehicle Restraint System Barriers • Street lighting electrical works. • Landscaping works.
Bidders should be aware from the outset that the maximum budget available for this contract is £2.6m. Bidders who submit a bid over this amount will be rejected.
The procurement documents are available for unrestricted and full direct access, free of charge, at: http://www.supplyingthesouthwest.org.uk Tenders or requests to participate must be submitted electronically via: http://www.supplyingthesouthwest.org.uk. Time limit for receipt of tenders or requests to participate: Date: 18/05/2020 Local time: 12:00
Additional information: The procurement documents are available for unrestricted and full direct access, free of charge, at: http://www.supplyingthesouthwest.org.uk Tenders or requests to participate must be submitted electronically via: http://www.supplyingthesouthwest.org.uk. Time limit for receipt of tenders or requests to participate: Date: 18/05/2020 Local time: 12:00
documents
- https://www.contractsfinder.service.gov.uk/Notice/0d88b851-1882-4c68-94dd-58c1dbcd0be1 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/7712716e-d473-4504-993b-a55dbca9acd1 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/fc3e145a-f42a-47e0-a72c-dcb24b820ea7 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Jun 2020 | Award (award) | · | dfce02d7-d4a5-49a4-8d72-0c72c496a3b2-366961 |
more from Devon County Council
- CP2828-26 - Strategic Partner to Support Local Government Reorganisation Implementation in Devon · £1,700,000,000 · 3 Jul 2026
- Public Bus Service (Lot 5) ND300 Ilfracombe - Lynmouth · £380,000 · 2 Jul 2026
- DCC: Lot 3 - 22nd June 2026 DP · £850,000 · 26 Jun 2026
- DCC: Lot 3 - 1st June 2026 DP · £500,250 · 25 Jun 2026
- CP2797-26 ChatHealth Instant and SMS Messaging System and Health Websites · £117,669 · 11 Jun 2026
- CP2777-26 JACs Specialist Project Manager · £910,000 · 9 Jun 2026
- South West Collaborative De-Icing Salt Framework - 2026/2027 Mini Competition - Lot 4 25kg Bags in 1 Tonne Packs and 1 Tonne Dumpy Bags of De-icing Salt to BS3247:2011 + A1:2016 · £18,968 · 3 Jun 2026
- South West Collaborative De-Icing Salt Framework - 2026/2027 Mini Competition - Lot 3 Bulk Brining Salt For Use in Saturators · £172,110 · 3 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Herefordshire Western Bypass Phase 1 · Herefordshire Council
- Infrastructure Works at Hethel Technology Park · South Norfolk Council · £5,000,000
- TD2142 - Road repairs to concrete roads · DERBY CITY COUNCIL · £101,665
- B714 Upgrading Construction · North Ayrshire Council · £26,000,000
- St John's Road - Improvement of Walking and Cycling Lanes · The Council of the Borough of Kirklees
- L00264-001-P1 - Kings Heath Local Centre Footway Widening Works - BCFMW Lot 1 - AWARD · Birmingham City Council
- Transport for West Midlands (TfWM) Bus Priority Programme · West Midlands Combined Authority · £4,639,102
- Road Resurfacing and Reconstruction Framework · Aberdeenshire Council · £53,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.