gvtcx

Bulk Supply Transfer Scenario Development during drought / operational incident

O F W A T Published 13 Sept 2024 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£18,550
Statuscomplete
Category (CPV) 79410000
RegionWest Midlands, London
Deadline4 Dec 2023
Contract start19 Jan 2024
Contract end29 Mar 2024
Procedureselective
SME suitableYes
OCIDocds-b5fd17-d243125c-4b1e-4985-a4ef-8d5f59fdf99c

Award

SupplierValueDateStatus
WSP UK Limited £18,550 12 Dec 2023 active

description

Awarded under the Ofwat Consultancy Framework, Lot 4: Water Engineering Science and Technology.

We require the development of up to 10 scenarios against which we are able to test how fair shares might operate. These scenarios should set out the operational impacts on both the exporter and importer of those operations from the circumstances that arise, including impacts on their assets and customers. Using this we will evaluate the impacts of the fair shares arrangements on operational decision and outcomes.

For example, the impact of an open water transfer on a water course, or a transfer from a reservoir and if the transfer would have to cease at a particular flow level or could have an impact on future operations if it were to continue.

The Supplier Personnel will be working alongside and reporting to RAPID staff. This project will support that of the existing RAPID Regulatory and Commercial team working on the development of the fair shares approach. The Supplier Personnel will be expected to join a short progress meeting once a week.

Key Deliverables and Outputs

Production of up to 10 written scenarios (draft and final versions) with each setting out:

A different situation in which fair shares could operate - such as drought order / TUBs in place for the exporting water company, but not for the importing company; or an operational incident for the exporting company.
The range of engineering / operational issues which might be occurring because of the situation - such as operational challenges for reservoirs or drought orders.
The effect of fair shares on both the exporting and importing water company operations.
Anything significant that is missing from the list above subject to Ofwat's agreement in advance.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
13 Sept 2024 Award (award) · 77c496a4-b6a5-4555-a1dd-53ec0e39ab57-785258

more from O F W A T

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.