Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure

Mace Dragados Published 20 Aug 2025 Contracts Finder

key details

Value£2,500,000
Statusactive
Category (CPV) 45223210
Deadline26 Aug 2025
Contract start8 Dec 2025
Contract end30 Jun 2026
SME suitableYes
OCIDocds-b5fd17-d22ed6b6-0317-4f71-90fb-908a75f81aa8

description

Mace Dragados require a steelwork subcontractor to carry out the design (to Stage 5) supply, fabrication, installation and erection of the following

  1. A 13200mm long 2100mm wide link bridge connecting the Maria Fidelis Old School Building and the Maria Fidelis Building Accommodation first floors. Includes steel structure, concrete foundations and cladding.
  2. Steel frame structure, concrete foundations and external cladding for a 8 person lift shaft on the Maria Old School Building providing access to ground level, bridge level, first floor, second floor and roof. Lift to be installed by Others.
  3. A 10m x 4m steel canopy at the entrance of the Maria Fidelis Old School Building.

See attached drawings

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
20 Aug 2025 Tender (tender) · 883d2c15-2c39-43d1-a129-f452ef686b0b-860114

more from Mace Dragados

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.