DESIGN AND SUPPLY OF FORMWORK & FALSEWORK EQUIPMENT AND MATERIALS FOR LONG ITCHINGTON WOOD AND LONG ITCHINGTON GREEN PORTALS
key details
| Value | £500,000 |
|---|---|
| Status | active |
| Category (CPV) | 45223500 |
| Region | West Midlands |
| Deadline | 21 Sept 2020 |
| Contract start | 18 Oct 2020 |
| Contract end | 1 Sept 2021 |
| SME suitable | No |
| OCID | ocds-b5fd17-ce27f4f2-6106-45b1-b617-e6d439383d49 |
description
Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts, lots N1 and N2..
We are looking to engage with the Formwork supply chain to provide design, drawings and supply of various types of formwork & falsework systems and the subsequent supply of respective equipment and materials.
Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following:
- Integrity
- Leadership
- Respect
- Safety
In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include:
- Making HS2 affordable
- Delivering on promises
- We build with people in mind
- Delivering more than a railway
- Achieving more together
- Creative and challenging
Successfully shortlisted supplier's will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier's may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted.
On selection, shortlisted supplier's will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence.
BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north.
More about BBV:
- VINCI is the largest contractor in the world
- Balfour Beatty is the largest contractor in the UK
- BBV have been working together for the past 30 years, their first project being the channel tunnel.
For more information please visit our website www.balfourbeattyvinci.co.uk
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=51032980 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/f64ef978-fb81-45e4-9f86-17b3fa7e3c6e , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 16 Sept 2020 | Tender (tender) | · | f64ef978-fb81-45e4-9f86-17b3fa7e3c6e-381506 |
more from Balfour Beatty VINCI JV HS2
- BBV HS2 MWCC North - Architectural Construction Works - Buildings · £5,000,000 · 23 Jun 2026
- BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts · £2,500,000 · 13 May 2026
- BBV Sublot 4 - HSST1020 - Deck realignment and jacking operation · £500,000 · 24 Mar 2026
- BBV HS2 MWCC North - Project Wide Noise Barrier Acoustic Doors (Supply Only) · £1,000,000 · 19 Mar 2026
- BBV Sublot 4 - HSST1020 - WWH Hydraulic Ramp reposition · £500,000 · 16 Feb 2026
- BBV HS2 MWCC North - Project Wide Utilities Works · £2,500,000 · 6 Jan 2026
- BBV Delta Junction - HSST1040 Deck Subsurface Drainage · £50,000 · 5 Jan 2026
- BBV HS2 DELTA - Precast Concrete Culvert (Supply only) · £500,000 · 2 Dec 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Protocol 7B - Supply a concrete base for new sprinkler system · Derbyshire County Council · £26,595
- BE24046 - Shielding Blocks · UK SHARED BUSINESS SERVICES LIMITED · £11,305
- BBV HS2 MWCC North - Precast Concrete Parapets · BIP SOLUTIONS LIMITED · £1
- SASWP10 - Pre-Cast Abutment Supply · Skanska Infrastructure (Rail) · £500,000
- Tideway East - EARPS Formwork, rebar and concrete · BIP SOLUTIONS LIMITED
- Permanent Bridge Beam Infill Shuttering Systems - GRP Forms · Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 · £10,000,000
- BBV HS2 MWCC North - Formwork & Falsework Equipment and Materials - Hire · Balfour Beatty VINCI JV HS2 · £500,000
- Owlcotes Bridge Bearing Replacement - Call off Lump Sum Tender Bid from DN439501 Bridge Maintenance and Masonry Repairs Contract · Leeds City Council · £400,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.