P1 Brackets and Cable Management System - Costain HRS02 Tunnel and Lineside M&E
key details
| Value | £10,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 31682410 +2 more |
| Region | West Midlands, London, South East |
| Deadline | 9 Oct 2025 |
| Contract start | 31 May 2026 |
| Contract end | 7 Jul 2028 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-14d7f770-fbb3-4dde-aa6e-60e8231fdf81 |
description
P1 Brackets and Cable Management System - Costain HRS02 Tunnel and Lineside M&E
Scope/ What Will Be Required
Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future.
Package 1 Brackets and Cable Management system scope associated to contract HRS02 consists of brackets and cable management systems for the route of the railway, the route being circa 180km in length, inclusive of;
-Tunnel Bracketry and associated fixings -Cross Passage Bracketry and associated fixings -Ladder Rack and Associated fixings -Cable Tray and associated fixings -Trunking and associated fixings
Costain require a supplier to design and supply only of the bracket and cable management system. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas.
-Health and Safety
-Programme - Installation and Commissioning activities -Cost
-Quality and Assurance Efficiency
-Whole Life Cost
-Carbon Efficiency
All the innovation and design development must be accompanied with a rigorous approach that the technical requirements are met. Including testing where necessary. The scope of design and supply will include the following:
-Support to Costain's design partner through concept and detailed design -Bracketry and Containment testing (Fatigue and Fire)
-Supply of bracketry and cable management system products and the associated fixings -Provision of samples and mock ups
Full details of the scope and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to able to carry out the intended scope of works prior to completing the expression of interest.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=100286452 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/307f28fa-b1c9-425f-abf7-8d0534b884a3 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 25 Sept 2025 | Tender (tender) | · | 307f28fa-b1c9-425f-abf7-8d0534b884a3-865413 |
more from Costain Group PLC
- P26 Electro-Magnetic Compatibility (EMC) Management Consultancy - Costain HRS02 Tunnel and Lineside M&E · £250,000 · 19 Dec 2025
- P24 Acoustic Testing - Costain HRS02 Tunnel and Lineside M&E · £500,000 · 2 Dec 2025
- P25 PRAMS - Costain HRS02 Tunnel and Lineside M&E · £500,000 · 2 Dec 2025
- P19 Maintenance - Costain HRS02 Tunnel and Lineside M&E · £1,000,000 · 20 Oct 2025
- P22 Security - Costain HRS02 Tunnel and Lineside M&E · £10,000,000 · 20 Oct 2025
- P20 Rail Plant - Costain HRS02 Tunnel and Lineside M&E · £10,000,000 · 20 Oct 2025
- P21 Logistics - Costain HRS02 Tunnel and Lineside M&E · £10,000,000 · 20 Oct 2025
- P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E · £500,000 · 20 Oct 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Cable Carriers · United Kingdom Atomic Energy Authority
- Platform Service Booms (WP9.1) - Old Oak Common (S4) Station - HS2 · Balfour Beatty VINCI Systra JV · £10,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.