A66 Northern Trans Pennine Upgrade: Archaeological Trenching
key details
| Value | £800,000 |
|---|---|
| Status | active |
| Category (CPV) | 45000000 |
| Region | North East, North West |
| Deadline | 16 Feb 2021 |
| Contract start | 1 Apr 2021 |
| Contract end | 1 Oct 2021 |
| Procedure | direct |
| SME suitable | Yes |
| OCID | ocds-b5fd17-ccd2d580-6655-4c2d-8f98-5999fc2ea728 |
description
Expressions of interest are sought from suitably qualified and experienced archaeological contractors to provide advance archaeological investigation (archaeological trenching) in connection with the above contract. All works are to be undertaken in accordance with the relevant CIfA Standards and Guidance.
A provisional trenching plan has been drawn up and will be supplied to the preferred supplier (s). The provisional trenching totals 1547 trenches comprising 81,217.5 sq m or 46410 linear metres. This represents a 2.5% sample of the land within the current red line boundary for the scheme.
It is anticipated that the chosen supplier (s) will be appointed in March 2021 and commence on site in April 2021.
The contractor will be expected to supply all plant and welfare facilities; and the manpower and equipment necessary to undertake the cleaning, sampling and recording of the proposed trenches.
The contractor will be required to lay out and supervise the opening of all the proposed trenches and to supervise the backfilling and making good of the proposed trenches.
The contractor will be expected to undertake reporting on the results of the evaluation. This is to include ongoing reporting during fieldwork at weekly intervals, an interim report available within one month of completing field work at any location and a final report incorporating dating, finds and palaeo-environmental assessments within 6 weeks of completing all fieldwork.
The contractor is to be responsible for the preparation of all necessary Health and Safety documents. The contractor will be required to liaise with the Amey/Arup land access and heritage teams to arrange access to the land required for trenching.
The appointed contractor(s) will be required to fulfil the duties of Principal Contractor as defined in CDM(2015).
Lots:
Lot 1:M6 Junction 40 to Kemplay Bank Roundabout and Penrith to Temple Sowerby (Center Parcs). A provisional total of 208 trenches.
Lot 2:Temple Sowerby to Appleby and Appleby to Brough (Warcop). A provisional total of 680 trenches.
Lot 3:Bowes Bypass (A66/A67), Cross Lanes to Rokeby and Stephen Bank to Carkin Moor. A provisional total of 332 trenches.
How to Apply:
Interested parties are requested to complete the attached/linked brief questionnaire.
A minimum of three and a maximum of six Tenderers will be shortlisted from evaluated applicants and invited to submit competitive tenders, the works being divided into three lots as described above. Tenderers will be required to submit returns for all lots.
Additional information: The following archaeological expertise will be required:
Site Manager - Similar site management experience
Archaeological Project Manager - MCIfA with at least 10 years experience
Archaeological Project Officer - ACIfA, with at least 2 years' experience of managing archaeological fieldwork Provide Archaeological Site Supervisor - PCIfA, with at least 2 years' experience of archaeological fieldwork Archaeological Site Assistant /technician - At least 6 months' professional experience of archaeological fieldwork Surveyor - PCIfA, with at least 2 years' experience of archaeological fieldwork
Osteoarchaeologist/ Environmental/Geoarchaeological Archaeologist /Finds specialist - MA/MSc with at least 10 years' experience
Suppliers must be able to demonstrate a proven track history in delivering similar archaeological works in excess of £250,000.
Supplier must have the following:
•Membership of the Chartered Institute for Archaeologists
•All staff working on or visiting the site are to hold suitable industry standard accreditation such as CSCS cards and any other requirement as may be stipulated by the Principal Contractor through their tender documentation
•Any resources used by the supplier must be PAYE employees of the Supplier, any non-PAYE employees will be subject to an IR35 test (to be paid for by the supplier)
•All suppliers must be registered on the HE Passport Scheme
•All suppliers must have Constructionline Gold standard or be registered on the Amey evaluation system Curtis Fitch in order to be considered for any opportunity, any successful supplier will need to have either Constructionline Gold standard or be fully evaluated on the Curtis Fitch system (No work can be carried out with Amey without fully completing the evaluation process)
Insurance Levels (Minimum requirements):
Employers Liability Insurance - £10m
Public / Products, Third Party Liability Insurance - £10m Professional Indemnity Insurance - £5m
documents
- https://he.validate.mitie.com , evaluationCriteria
- https://suppliers.amey.co.uk/ , evaluationCriteria
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/361b4627-4ab1-450b-bf1c-2918629cafb9 , technicalSpecifications
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/4f36328d-0f56-410b-8288-9168b4601096 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/e80086dc-c192-45df-80d0-52e802cdbe77 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 2 Feb 2021 | Tender (tender) | · | e80086dc-c192-45df-80d0-52e802cdbe77-409849 |
more from AMEY OW LIMITED
- National Highways Area 12 - Depot Maintenenace · £400,000 · 20 Feb 2026
- Expression of Interest · £60,000,000 · 29 Jan 2025
- National Highways Area 12 - Vegetation Management works · £1,600,000 · 16 Jul 2024
- National Highways Area 12 M&R - Surface Patching · £1,250,000 · 19 Apr 2024
- SBIM Waterproofing & Concrete Repair · £1,500,000 · 15 Apr 2024
- SBIM -Traffic Management · £1,500,000 · 15 Apr 2024
- SBIM Surfacing · £1,500,000 · 15 Apr 2024
- National Highways Area 12 - Vehicle Restraint Systems · £900,000 · 5 Mar 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PLACE1266H MHA PSP4 Agency Staff - S278 Street Lighting Support Scheme (2026 2027) · Derbyshire County Council · £80,000
- ENQ1310 - 2026-27 Structures Programme Assistance · DERBY CITY COUNCIL · £25,000
- CPU 7199 - Newstead Abbey MEND repair programme Quantity Surveyor · Nottingham City Council · £38,665
- CPU 7275 - Newstead Abbey MEND Repair Programme Conservation Accredited Lead Advisor · Nottingham City Council · £68,996
- Tickford Park Primary School SEND Unit · Milton Keynes Council · £101,188
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- L9-102 ATE Monument Roundabout · North Lincolnshire Council · £198,564
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.