gvtcx

Adaptor Plate for 15MW Forced Application System

Offshore Renewable Energy Catapult Published 8 Feb 2019 Contracts Finder

key details

Value£225,000
Statuscomplete
Category (CPV) 44000000 +3 more
RegionNorth East
Deadline19 Mar 2019
Contract start25 Apr 2019
Contract end24 Apr 2020
Procedureopen
SME suitableYes
OCIDocds-b5fd17-cc19bb25-fc34-41b8-931e-14372fecb5a4

Award

SupplierValueDateStatus
TSP Engineering Ltd £347,910 6 May 2019 active

description

ORE Catapult own and operate a 15MW Drive Train Test Facility, designed for testing the drive trains and individual components of offshore wind turbines.

To improve the ability of the test rig to interface with customers' test pieces, ORE Catapult is looking to appoint a single Contractor to manufacture and supply one (1) multi-functional adaptor plate.

The adaptor plate has been designed by the ORE Catapult mechanical design team to withstand the static and fatigue loads that may be foreseeably applied to it. OJEU Ref : 2019/S 028-061816

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
7 May 2019 Award (award) · fc2ade22-0959-4e3e-8485-0f21d1a78620-287833

more from Offshore Renewable Energy Catapult

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.