BHC Compound PV Scheme, Banjul, The Gambia

Foreign Commonwealth and Development Office Published 22 Jan 2025 Contracts Finder

key details

Statuscomplete
Category (CPV) 45317300
Deadline17 Oct 2024
Contract start13 Jan 2025
Contract end9 Sept 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-ca6c1aed-f353-44e1-8350-cf0312646441

Award

SupplierValueDateStatus
Concept Building Services (Southern) Ltd £933,250 14 Nov 2025 active

description

-The proposed scheme comprises the installation of photovoltaic arrays (PV) together with full replacement of the existing central distribution as part of the works on the British High Commission's Main Compound Site in Banjul, The Gambia. The works include:
-Installation of 2 No. new Photovoltaic arrays, ground mounting systems, all associated cabling and underground ducting, AC/DC services, including local energy supplier equipment, submitting applications, local energy supplier liaison and export metering systems.
-Replacement of the existing electrical main switchgear assembly to enable incorporation of photovoltaic arrays and battery energy storage facilities.
-Provision of battery storage facility situated in the generator building storage room adjacent to the main electrical switch room.
-Provision of cooling system including associated power supplies within the new battery storage room to ensure the battery units remain at optimum temperatures.
-Provision of mechanical ventilation situated in the generator building storage room adjacent to the main electrical switch room.
-Survey ground structure / integrity to confirm that the chosen areas can support the new photovoltaic installation.
-Survey the indicative cable ducting route from the proposed inverter positions to the main electrical switch room. Provide new trenching, for ductwork.
-Upgrades to the existing switch room and proposed battery storage room that shall include lighting, emergency lighting, fire alarm works and lithium-ion gas detection.
-Provision of earthing, bonding and lightning protection system, as required.
-Employ a Lightning Protection Specialist to provide a Lightning Protection / Earthing installation to bond any solar steel support frameworks and switchgear as part of these works.
-Provision of Builders work holes and fire stopping of service penetrations.
-Testing and commissioning of the new electrical switchgear, battery storage and photovoltaic equipment.
-Witness testing of the existing generators to ensure change-over functionality is operational.
-Testing and commissioning of the new electrical switchgear, battery storage and photovoltaic equipment.
-Witness testing of the existing generators to ensure change-over functionality is operational.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
22 Jan 2025 Award (award) · bd4258c5-efd3-46c1-8b33-a13f186cfd66-819483

more from Foreign Commonwealth and Development Office

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.