EKFB Wendover Green Tunnel Reinforcement
key details
| Value | £5,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 44450000 |
| Region | East Midlands, West Midlands, South East |
| Deadline | 10 Mar 2025 |
| Contract start | 5 May 2025 |
| Contract end | 30 Oct 2026 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-ca633418-a654-4ed2-9da2-590a00fd4ff1 |
description
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB are looking for a competent Supplier to deliver the routewide drainage requirements consisting of plastic drainage both solid and perforated of diameters 150mm to 1200mm circa 143,000 meters, concrete pipes of diameters 150mm to 2,100mm circa 4,300m, catchpits including cover slabs of various diameters 600mm to 3000mm in various depths circa 4,000 instances.
About the buyer's selection process:
Through this expression of interest you vetted in accordance with the EKFB pre-qualification model - for further information visit https://www.competefor.com/EiffageKier/
About the buyer:
EKFB is a joint venture that brings together international, market leading expertise from four leading civil engineering and construction companies: Eiffage, Kier, Ferrovial Construction and BAM Nuttall. All four partners bring specialist expertise in the design, construction, operation, financing and maintenance of railway networks, including some of Europe's largest high speed rail projects.
EKFB is committed to improving lives, communities and the engineering and construction industry by providing sustained employment opportunities and being a good neighbour, protecting the environment and the places we work. Our inclusive culture ensures that our collaborative and innovative solutions provide exceptional value for money.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=91034218 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/0f105aee-991b-47b5-9674-1cbecb32bdc1 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 6 Mar 2025 | Tender (tender) | · | 0f105aee-991b-47b5-9674-1cbecb32bdc1-832124 |
more from Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
- EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works · £500,000 · 23 Jun 2026
- EKFB JV - NC2A Footway and Accommodation Overbridges FRC works · £2,500,000 · 11 Jun 2026
- EKFB JV - Ancillary Culverts Works package NC2A · £1,000,000 · 18 May 2026
- EKFB JV - Highways Works - NC2A draft · £5,000,000 · 28 Apr 2026
- EKFB JV - Highways Works - NC2A · £5,000,000 · 28 Apr 2026
- Noise Barrier Specialist Bolts and Fixings · £5,000,000 · 18 Mar 2026
- EKFB JV - Seeding Works - G2S · £10,000,000 · 11 Feb 2026
- EKFB JV - Planting Works - G2S · £5,000,000 · 11 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ECFRS00315 Planned Preventative Maintenance Wethersfield and Orsett training Facilities · Essex Police, Fire and Crime Commissioner Fire and Rescue Authority · £250,000
- FM22072 - Steel Plates · UK SHARED BUSINESS SERVICES LIMITED · £11,556
- NON AWARD- Provision of Mild Steel Drums and Liners · CTM Portal for the NDA Shared Services Alliance · £713,014
- ESS Storage Pit Lids · United Kingdom Atomic Energy Authority
- UK SBS PR150098 - Mild Steel - Radiation Shielding · UK SHARED BUSINESS SERVICES LIMITED · £2,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.