National Railway Museum Central Hall Design Competition
key details
| Value | £1,845,000 |
|---|---|
| Status | active |
| Category (CPV) | 71200000 |
| Region | Yorkshire and the Humber |
| Deadline | 16 Oct 2019 |
| Contract start | 1 Apr 2020 |
| Contract end | 1 Jun 2025 |
| Procedure | selective |
| SME suitable | No |
| OCID | ocds-b5fd17-ca2029f0-40a1-4df3-8e62-e64c3a590209 |
description
The National Railway Museum Central Hall Design Competition seeks an outstanding integrated team to design a new centrepiece building and propose enhancements to some of the fabric, infrastructure and organisation of the existing museum buildings.The Central Hall will unite the core museum buildings, combining a new entrance experience with public-facing spaces for exhibition, orientation and reception.The circa 4,500 sqm building needs to seamlessly integrate with existing museum spaces and will feature a spectacular new 1,000 sqm gallery. The building has a GBP16.5 million construction budget.A series of significant upgrades to the existing buildings is also planned, with budgets identified for elements such as roofs, facade, demolitions, openings and services. These works have an associated construction budget of no more than GBP10 million. Depending on the post competition concept design, a proportion of these works may be undertaken by the appointed team for this project.
documents
- https://www.contractsfinder.service.gov.uk/Notice/e9ba52aa-779c-4192-9fb7-9cdaf24a6e88 , tenderNotice
- https://www.mytenders.co.uk/search/show/search_view.aspx?ID=SEP158113 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Sept 2019 | Tender (tender) | · | e9ba52aa-779c-4192-9fb7-9cdaf24a6e88-312916 |
more from Science Museum Group
- SIM Architect and Lead Designer for Wonderlab and Power Up - AWARD · 2 Dec 2025
- Flight Gallery Improvements - Graphics - AWARD · 1 Oct 2025
- ScM Flight Gallery - Lighting Upgrades - AWARD · 1 Oct 2025
- Locomotion Exit Surveys 2024-27 - AWARD · 23 Sept 2025
- NRM Building Regulations Principal Designer - AWARD · 27 Aug 2025
- NCC Consolidation Project: Manufacture and Supply of 200 Large Pallets - AWARD · 21 Aug 2025
- Disassembly and Removal of Existing Pallet Racking and Manufacture and Installation of Adjustable Pallet Racking in Hangar L1 - AWARD · 21 Aug 2025
- Horizons Gallery Graphic Designer - AWARD · 20 Aug 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Framework for Architectural Services for Codi Group’s Residential Schemes · Codi Group Ltd · £2,000,000
- PROPOSED COMMUNITY SPORTS FACILITY AT LAURELVALE · Armagh, Banbridge & Craigavon Borough Council
- Fframwaith Ymgynghori Adeiladu / Construction Consultancy Framework · Adra (Tai) Cyf · £4,000,000
- Call off under the NHS SBS Framework SBS10190 (Lot 7) · BIRMINGHAM CITY COUNCIL · £300,000
- Broadlands Children's Home - Architectural Services · Bristol City Council · £88,571
- GLA Architecture and Urbanisation Framework 4 · Transport for London
- Architect Framework for the South West Region · Sanctuary Housing Group · £1,320,000
- North Walney Project - NEC4 PSC (Pagabo) - RIBA Stages 4-6 · Natural England · £132,331
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.