HS2 C1 ALIGN JV - Cross Passage Conveyor
key details
| Value | £50,000 |
|---|---|
| Status | active |
| Category (CPV) | 42417200 +2 more |
| Deadline | 16 Sept 2021 |
| Contract start | 15 Nov 2021 |
| Contract end | 29 Nov 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-ca024842-87ec-4a42-a393-f9dc14af91a0 |
description
Contract general scope of works:
| • | Require 3 units of complete conveyor system to remove spoil from Cross Passage excavation face to the skips used to store then remove it from the tunnel. |
| • | Option for 1 unit to be purchased later if required. |
| • | Items above includes design, interface drawing, manufacturing, factory acceptance tests, packing and packaging, transport from factory to DAP buyer jobsite (Incoterms 2010), commissioning and training of the jobsite personnel. |
The package will be competitively tendered and assessed against a split between commercial (price) and non-commercial/technical criteria - The intention of the Contractor that these works will be tendered as 1 enquiry, however we reserve the right to split the works and award the package to more than 1 sub-contractor.
In July 2017, ALIGN (Bouygues Travaux Publics, Sir Robert McAlpine and Volker Fitzpatrick) won the significant C1 package of the UK High Speed 2 line (HS2). Lot C1 consists of 21.6km of high speed rail infrastructure in a rural environment. This will include a 3.37km viaduct, 15.75km twin-tubes tunnel and five vent shafts handling both piston effect and tunnel ventilation.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=57894241 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/df120b3e-ad32-40b9-ad88-5b28eada2f98 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 10 Sept 2021 | Tender (tender) | · | df120b3e-ad32-40b9-ad88-5b28eada2f98-467515 |
more from ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)
- HS2 C1 ALIGN JV - CSP Temporary Access Road Reinstatement and Remaining Permanent Works · £2,500,000 · 18 Aug 2025
- HS2 C1 ALIGN JV - SHC Permanent Landscape & Track Drainage · £5,000,000 · 22 May 2025
- HS2 C1 ALIGN JV - SHC Soft Landscaping and Permanent Fencing - Rev1 · £5,000,000 · 22 May 2025
- HS2 C1 ALIGN JV - Road Construction and Surfacing · £2,500,000 · 22 May 2025
- HS2 C1 ALIGN JV - GRP Ebmankment Steps · £250,000 · 15 May 2025
- HS2 C1 ALIGN JV - Leather Lane FRC · £5,000,000 · 20 Jan 2025
- HS2 C1 ALIGN JV - Amersham Highways Drainage (Supply & Install) · £500,000 · 18 Sept 2024
- HS2 C1 ALIGN JV - Amersham Gate Supply & Install · £150,000 · 4 Sept 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Design, Supply, Installation and Commissioning of Container Ware Conveyor System · Glass Futures · £680,000
- To modify existing chain conveyor system for notes waste · BANK OF ENGLAND · £48,000
- PAPI 1012.1 - Geared Motor Roller Conveyor Drive Unit - AWARD · University of York · £4,000
- Purchase of Modular Dual Axis Conveyor System · UNIVERSITY OF SHEFFIELD · £85,790
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.