HS2 Main Works S1 & S2 - WP023 - Crane Maintenance
key details
| Value | £2,500,000 |
|---|---|
| Status | active |
| Category (CPV) | 71352000 +6 more |
| Deadline | 6 Dec 2022 |
| Contract start | 7 Apr 2023 |
| Contract end | 30 Apr 2027 |
| SME suitable | No |
| OCID | ocds-b5fd17-c98fece4-08ef-422b-a4aa-2dcdcde7b04c |
description
Skanska Costain Strabag Joint Venture (SCSJV) are seeking supply chain partners to provide crane maintenance services for the HS2 Main Works Civils Contract Area Central.
The Subcontractor provides all management, people, equipment, plant and materials, consumables (including fuels) and any other resources necessary to carry out and complete the items below.
Timing of work to be agreed 4 weeks prior to planned commencement.
LOLER thorough examination of each crane (e.g., https://www.hse.gov.uk/work-equipment-machinery/thorough-examinations-lifting-equipment.htm).
Periodic LOLER thorough examination according to LOLER requirements Including but not limited to:
Wear checks and measurements on brakes, ropes, mechanical and electrical components
Visual inspections and functional checks of all components, including but not limited to brakes and safety devices
All brakes are visually inspected thus ensuring that the brakes are working efficiently and without undue wear.
Visual checks for defects - all components.
Visual structural inspection of the crane.
Non-destructive testing, load testing and other tests as deemed appropriate by the competent person.
Disassembly or internal examination of parts as required to conduct the above examination items.
Any other checks as specified by the manufacturer.
Report of inspection as per LOLER requirements (e.g. LOLER Schedule 1: https://www.legislation.gov.uk/uksi/1998/2307/schedule/1/made). Immediate notification to Contractor of any defects noted to be a danger to people.
Schedule of examinations to be every 6 months initially (following examination at commissioning) then adjusted as needed according to as per a competent person recommendation taking into account the work environment and historical findings. Adhoc inspections maybe required in the event of exceptional circumstances (e.g. damage).
Bimonthly servicing (every two months). This may be adjusted should the servicing reports indicates more, or less frequent inspections are required.
Upon completion a detailed report to be provided to the Contractor.
Quote for remedial works associated with any defects identified to be provided.
Servicing to consist, as a minimum, of the following:
Wear and other defect checks of load ropes
All safety devices are checked for correct operation and adjusted as required
All electrical components are checked for wear, cleaned, and adjusted where necessary.
All brakes are adjusted to the correct settings, thus ensuring that the brakes are working efficiently and without undue wear.
All safety devices are checked for correct operation and adjusted if required.
All mechanical components are checked for wear.
Full lubrication program as per OEM and/ or industry recommendations
Subcontractor to provide a breakdown response service which includes out of hours unscheduled onsite work and over the phone assistance. This service to be provided 24x7 unless otherwise agreed.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=66528786 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/74e8a266-1028-4cb4-b7fc-960ab9e1e921 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Nov 2022 | Tender (tender) | · | 74e8a266-1028-4cb4-b7fc-960ab9e1e921-594349 |
| 9 Feb 2024 | Award (award) | · | 5f0ec635-1e88-4023-b785-ee1ee507d57e-722156 |
more from SCS JV (Skanska Costain Strabag Joint Venture)
- HS2 Main Works S1 & S2 - Mobile Elevating Working Platforms (MEWPS) - Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) Certified Inspection and Examination · £1,000,000 · 27 Mar 2023
- HS2 Main Works S1 & S2 - Multi Service Vehicle (MSV) and Public Service Vehicle (PSV) ad hoc maintenance · £1,000,000 · 27 Mar 2023
- HS2 Main Works S1 & S2 - Fire Suppression Maintenance · £1,000,000 · 23 Mar 2023
- HS2 Main Works S1 & S2 - Concrete Pumps Repair · £1,000,000 · 23 Mar 2023
- HS2 Main Works S1 & S2 - Volvo Excavators Maintenance · £1,000,000 · 22 Mar 2023
- HS2 Main Works S1 & S2 - Water Sampling and Testing · £1,000,000 · 22 Mar 2023
- HS2 Main Works S1 & S2 - Lifting (Segment) Grab Maintenance · £1,000,000 · 22 Mar 2023
- HS2 Main Works S1 & S2 - Kubota Tractor Maintenance · £1,000,000 · 22 Mar 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- DR2000 Drainage Surveys - AWARD · Bedford Borough Council
- Site survey - Nar Ouse Enterprise Area King's Lynn · Borough Council of Kings Lynn and West Norfolk · £144,929
- Peatland Restoration - Peat Depth Survey and Herbivore Impact Assessment · Loch Lomond & The Trossachs National Park Authority · £10,000
- Satellite Surveys - Leakage · ANGLIAN WATER SERVICES LIMITED
- Traffic speed Structural Surveys 4 (TRASS4) · National Highways · £2,000,000
- NPH Archaeological Surveys · West Northamptonshire Council · £500,000
- UKRI RE19202 - Volcanic Eruption Survey · UK SHARED BUSINESS SERVICES LIMITED · £72,197
- GB-Leeds: Z/3460 Parklife Boddington - Football Pitches Design Team · University of Leeds · £37,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.