gvtcx

Monitoring Designated Sites: Setting Priorities and Making Best Use of New Technology

JNCC SUPPORT CO Published 18 Jan 2019 Contracts Finder

key details

Value£12,000
Statuscomplete
Category (CPV) 90700000
RegionEast of England
Deadline8 Feb 2019
Contract start13 Feb 2019
Contract end28 Jun 2019
Procedureopen
SME suitableNo
OCIDocds-b5fd17-c8433a9d-a54e-4cf1-a601-6dc71067271f

Award

SupplierValueDateStatus
Bodsey Ecology Ltd £11,970 15 Feb 2019 active

description

  1. Project Aims

Update the current CSM approach to monitoring protected areas by the Statutory Nature Conservation Bodies (SNCBs) within the UK. This update will adapt to the availability of new technologies and ensure effective choices are made in respect of monitoring frequency and techniques applied. This will complement the two-route site selection model and existing Common Standards Monitoring (CSM) Guidance and help the SNCB's achieve two objectives:

i.Continue to report on the condition of designated conservation sites in the UK effectively; and
ii.maximise the value of the CSM process in supporting effective site management.

Note that this contract is in two Phases. Section 6 of this contract is therefore relevant and should be noted in respect of the second phase of the work.

  1. Project Background

This project will span the 2018_19 and 2019_20 financial years and have two phases. Phase 1 should be completed by 29 March 2019. If undertaken, Phase 2 should be completed by June 2019. The contractor must split their bid timings and costs into these two Phases.

An Inter-agency Working Group (IAWG) is updating the CSM Guidelines and is developing updated and transparent approaches to site monitoring that maximise the value of the human and financial resources available. The IAWG (with a representative from each of four countries) want to combine new technologies with the more traditional expertise of the SNCBs, to devise a way which is efficient, effective, reliable, and delivers for biodiversity.

The need to review CSM monitoring

The original Common Standards Monitoring (CSM) was designed to be a rapid assessment method to be carried out, in most cases, by Conservation Officers or Site Managers. It aimed at being a low-risk, comprehensive, approach which ensured that all elements of the A/SSSI (Area/Site of Special Scientific Interest) network were covered at least once in every six years and was a good way to report on the condition of sites individually and in aggregate. However, the method resulted in many 'no change' assessments, at considerable cost. The SNCBs want to develop a strategy for future monitoring of A/SSSIs that allows resources to be used most effectively.

Additional information: You are invited by JNCC Support Co (JNCC) to submit a tender for the supply of works or services required under the above project. If interested, you should download and carefully read the documents contained within the zip file.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Mar 2019 Award (award) · c5c6ff9b-02df-4e7a-b91c-157e6c6a7591-273767

more from JNCC SUPPORT CO

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.