gvtcx

Atkins Par Highway Dam MIOS Design PSC C Contract

Defra Network eTendering Portal Published 16 Nov 2021 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£120,830
Statuscomplete
Category (CPV) 71300000
RegionSouth West
Deadline12 Nov 2021
Contract start15 Nov 2021
Contract end16 Aug 2022
Procedureselective
SME suitableYes
OCIDocds-b5fd17-c7ee15bb-0ff0-45fe-8bbd-b39be5dccac8

Award

SupplierValueDateStatus
Atkins Ltd £120,830 12 Nov 2021 active

description

Design contract to undertake the Measures in the Interest of Safety following the Section 10 reservoir safety inspection at Par Highway Dam. The preferred solution is to discontinue the reservoir. This is to be undertaken by removing the outlet structure and re-profiling the embankment on the alignment of the Treffry Canal. The design shall include flood alleviation works to Highway Garage immediately downstream of Highway dam and an upgrade to the penstocks on Treesmill Dam outlet structure.

Additional information:

The form of contract is NEC4 PSC and the Terms and Conditions can be obtained from info@neccontract.com.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
16 Nov 2021 Award (award) · 9e4da001-00a0-4712-8495-38a0e0d6e605-485989

more from Defra Network eTendering Portal

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.