Earthing & Lightning Protection (WP37.1) - Old Oak Common (S4) Station - HS2
key details
| Value | £500,000 |
|---|---|
| Status | active |
| Category (CPV) | 45312311 +2 more |
| Region | London |
| Deadline | 3 Jun 2021 |
| Contract start | 1 Oct 2021 |
| Contract end | 31 Jul 2026 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-c64e2dea-c5ca-42d8-bed5-8f0af8363ede |
description
WP37.1 Earthing and Lighting Protection
Scope of Work :
WP37.1 scope consists of the design development, supply, installation, validation and assurances of the earthing, bonding, and lightning protection to the whole project, including HS2 and GWML stations plus Shared Accommodation Building at Old Oak Common Station.
The successful contractor of WP37.1 will be novated to the successful contractor of WP23.1 once awarded.
All works to be installed in accordance with the Earthing Management Plan reference: -
- 1CP02-BVS_WSP-EL-PLN-SS07-000001
The Earthing Management Plan specification document is to be read in conjunction with the Standards and Guidance documents, as identified in its section 5. Particularly HS2 standards and British Standards 7671:2018 and 7430 2011 + A1 2015.
BBVS have several piled structures which contain earthing and lightning protection interfaces. WP37 Subcontractor will review, install, and record assurance evidence prior to the main MEPH subcontract being placed.
The subcontractor is to further develop the RIBA 4 design to include the installation processes, commissioning, project assurance, operation and maintenance manuals, operator, and maintainer training, for the earthing and Lightning protection package.
Full scope detail is within the earthing management plan, which forms the basis of this works package. The delivery of this package covers but not limited to the following activities: -
| • | Development of RIBA 4(A) design produced by WSP for BBVS to final part RIBA 4 (B) with a fully integrated and buildable Earthing and lightning Protection design. |
| • | Responsible for the overall station common bonding system, linking and separating all earthing and bonding across the two stations. This includes but not limited to lightning protection, HV/LV, and traction. |
| • | Periodic review during RIBA 4B and RIBA 5 of the electrical design to ensure compliance. |
| • | Period Testing along with care and custody is a requirement to handover and will be included within this work package. |
| • | Consideration should be given to working with other subcontractors to Maximise off-site installation. |
About the buyer's selection process:
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment).
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity.
In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Interchange at Old Oak Common.
No Documentation is included at this point.
Additional information: No Documentation is included at this point.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=55580451 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/3e5abd1b-9493-4392-adf6-dde87d543fe0 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 May 2021 | Tender (tender) | · | 3e5abd1b-9493-4392-adf6-dde87d543fe0-437042 |
more from Balfour Beatty VINCI Systra JV
- WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4) · £20,000,000 · 28 May 2026
- Traffic Management - Old Oak Common (S4) Station · £2,500,000 · 10 Mar 2026
- Fit Out - WP12.10 Statutory and Wayshowing Signage- Old Oak Common (S4) Station · £500,000 · 31 Oct 2025
- WP15 Final Highways Scope - Old Oak Common (S4) Station · £20,000,000 · 21 Aug 2025
- Labour Supply - Old Oak Common (S4) Station · £1,000,000 · 28 Jul 2025
- BBVS & HS2 Station Furniture - HS2 Phase 1 Stations - Old Oak Common (S4) Station · £5,000,000 · 13 May 2025
- WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station · £5,000,000 · 10 Apr 2025
- Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station · £10,000,000 · 7 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Awarded Lightning Protection Systems Inspection and Testing · Southern Health NHS Foundation Trust · £20,000
- CA12701 - Tender 33/2023 - (Retender) New Lightening Protection System (LPS) Newcastle Centre, Co. Down · Newry, Mourne and Down District Council (NMD)
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.