Wylfa Electrical Overlay System - Phase 2 On Site Distribution
key details
| Status | complete |
|---|---|
| Category (CPV) | 45310000 +4 more |
| Deadline | 12 Nov 2021 |
| Contract start | 22 Jun 2022 |
| Contract end | 24 Aug 2023 |
| SME suitable | No |
| OCID | ocds-b5fd17-5a82c940-a901-4859-86e5-59aabaf7eecc |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| UK Power Networks | £1,690,937 | 21 Jun 2022 | active |
description
Magnox require the design, supply and installation of a new Electrical overlay system at their Wylfa Site in North Wales. This will require design, civil and electrical works under provision of a complete turnkey project. A new and independent electrical infrastructure system is required that will meet modern standards, and is appropriate for the site's present and future electrical load. The scope of work involves the design, manufacture, supply, build, cable & switchgear installation, works-test, delivery to site, off-loading, moving into final position, installation and testing/commissioning of the electrical systems and civil structures. A detailed design of the electrical infrastructure system, taking into account the electrical demand, location for the loads, type of switchgear, transformers, electrical protection, metering equipment, cabling, cable routing etc. is required along with all construction works to support the electrical infrastructure A 2000 KVA District Network Operator (DNO) supply is available at the site boundary which is to supply new 11 KV Switchgear, which in turn will supply two new 11 KV / 415 V Package Substations (PS), one in the Switch house and the other on-site which will support the existing site electrical demand
documents
- https://www.contractsfinder.service.gov.uk/Notice/d609674f-69bf-4409-a36d-e9c0a2929c46 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 26 Mar 2021 | Tender (tender) | · | d609674f-69bf-4409-a36d-e9c0a2929c46-423825 |
| 23 Jun 2022 | Award (award) | · | 32a421a5-b50b-4705-ba6b-1368a39ed384-548873 |
more from CTM Portal for the NDA Shared Services Alliance
- ABB OEM Maintenance of Control Systems FY2023 · £709,231 · 28 Apr 2023
- Industrial Reliability and Performance Improvement - Energy monitoring pilot · £73,400 · 28 Apr 2023
- Industrial Reliability and Performance Improvement - Predictive Maintenance Application · £97,200 · 28 Apr 2023
- WP 5.3: Trial Rig - Prep for Shep · 27 Apr 2023
- Sellafield Dive Boat - Harbour Facilities · 25 Apr 2023
- Gilligan Jig and remaining spares · 20 Apr 2023
- Coordinate and manage the delivery of the 'Elements' work awareness programme · £118,940 · 28 Mar 2023
- DDP00641 - Initiate HEx 2 Study to SOC · £160,000 · 1 Mar 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Replacement of DB Boards · Gloucestershire Hospitals Subsidiary Company Limted · £97,814
- CA16855 - R5991 STH Emergency Lighting Continuation QMHC and C2 · Epsom & St Helier University Hospitals NHS Trust
- CA16894 - R5991 Lombard Road LED Installations · Epsom & St Helier University Hospitals NHS Trust
- Shore Power Systems Framework · Caledonian Maritime Assets Ltd (Utility)
- Four Schools M&E Upgrade Works · BD Group
- Contract for Waun Wen Primary Phase 3 Electrical Rewire · City & County of Swansea · £77,000
- WARWICK ROAD PRIMARY SCHOOL - FIRE ALARM REPLACEMENT · Kirklees Council · £64,019
- Merseytravel Electrical Framework 2026-2030 · Liverpool City Region Combined Authority · £12,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.