gvtcx

Bolton Fell Moss - Phase 3 Construction Contract

Natural England Published 14 Feb 2024 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£775,155
Statuscomplete
Category (CPV) 45000000
RegionNorth West
Deadline19 Jan 2024
Contract start1 Feb 2024
Contract end29 Mar 2024
Procedureselective
SME suitableYes
OCIDocds-b5fd17-bce957f1-ace1-4f6d-89a3-580f1fdb1bd6

Award

SupplierValueDateStatus
A E Yates Ltd. £775,155 1 Feb 2024 active

description

The former Bolton Fell peat works (Factory Site) adjoins Bolton Fell Moss Special Area of Conservation (SAC) which was first confirmed as a Site of Community Interest in 2009 for its 'degraded raised mires, still capable of restoration'. It was designated as a full SAC in 2016, requiring the UK government to safeguard the site and ensure its restoration. Following the cessation of peat cutting, the existing Site of Special Scientific Interest (SSSI) was extended to include all the land necessary for this and the commencement of restoration of the degraded raised mire.

Decontamination and demolition of the factory site was carried out in 2017-2019, ie buildings demolished and removed, materials and identified contaminated wastes removed.

An attempt to deal with the large amounts of run-off from the concrete in winter 2020-21 (previously drained into underground sumps some of which have been removed/blocked) has been only partially successful due to insufficient knowledge of the previous drainage system (likely to have evolved organically over the decades of use as a factory site).

The wider site and habitats have been declared a National Nature Reserve and will have Public Access. Its future management priority will be for its nature conservation interest.

The project has been proposed over three phases with phases one and two design and feasibility successfully delivered under the FOF Framework.

This third phase of the project - The construction phase has been successfully tendered and awarded under the Crown Commercial CWAS Lot 1.2.1 framework in January 2024

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
14 Feb 2024 Award (award) · 1bce1b1f-49f6-4f29-b357-924dd8fa04e8-723487

more from Natural England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.