WP112.1 Permanent Walkways

SCS JV Published 17 Oct 2023 Contracts Finder

key details

Value£2,500,000
Statusactive
Category (CPV) 45213316
RegionLondon
Deadline30 Oct 2023
Contract start3 Mar 2025
Contract end1 May 2028
SME suitableNo
OCIDocds-b5fd17-bbe97656-2a62-491f-bc39-cbd6db3957da

description

The works are located at Northolt Tunnels West (NTW) Northolt Tunnels East (NTE) and Euston Tunnels (ET). At each location a twin-bore tunnel will be constructed, forming two parallel tunnels, each containing a single rail track. SCS JV will construct 13 miles of twin-bore tunnels on the HS2 route using six TBMs, of which five will operate simultaneously.

Approximately 42km of escape and maintenance walkway must be constructed throughout the length of the running tunnels. The emergency walkway shall run on the cross passage side and connect to it as well as to safe areas at portals, intervention points and shafts to provide a safe walking route. The maintenance walkway shall be installed on the opposite side to facilitate access for the inspection, maintenance and periodic component replacement operations necessary for train operation.

The preferred construction methods for the tunnel walkways shall be either horizontal slip-forming system (slip-forming paver) or a system using mechanised shutter-based slip formwork.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
17 Oct 2023 Tender (tender) · a767a30f-71c1-4ce7-bca5-dcb1ff2c7b53-689795

more from SCS JV

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.