gvtcx

EKFB JV - Wastewater Disposal

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 Published 31 Oct 2022 Contracts Finder

key details

Value£500,000
Statusactive
Category (CPV) 45252127
RegionSouth East
Deadline11 Nov 2022
Contract start26 Jan 2023
Contract end25 Jan 2024
SME suitableYes
OCIDocds-b5fd17-bb59f490-57c3-4728-9044-43982bcb9321

description

EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.

EKFB are looking for the following services which shall include but not necessarily be limited to:

Waste contractor is to provide skip exchanges and removal of soils, aggregates and bituminous mixtures, some of which may be contaminated. Prior to waste removal testing will be undertaken by EKFB to confirm contamination, if required. Possible contaminants are listed below.

  1. Groundwater
2.Surface water
-TPH
-Concrete
3.Road sweeping arisings
-TPH / PAH
4.Soils
-TPH / PAH
-PCB
-Asbestos
5.Aggregates
-TPH / PAH
6.Bituminous mixtures
-Coal tar
  1. Used COSSH

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
31 Oct 2022 Tender (tender) · 691b097b-6ef6-4a38-9bc9-4f6f2bd45397-585269

more from Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.