EcoSF4: Judas Gap Fish Pass Detailed Design
key details
| Value | £73,826 |
|---|---|
| Status | complete |
| Category (CPV) | 90700000 |
| Deadline | 16 Feb 2026 |
| Contract start | 20 Feb 2026 |
| Contract end | 31 Jul 2026 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-b5873bc5-91cc-430a-b1b9-a3e994a319ae |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Jeremy Benn Associates Limited (t/a JBA Consulting) | £73,826 | 18 Feb 2026 | active |
description
Judas Gap is an Environment Agency owned structure located at the saline limit on the River Stour on the Essex Suffolk border, NGR TM0799732809. The site already has a pumped eel pass installed in the old fish pass chamber.
The Judas Gap structure is critical in terms of fish movements for the Stour, for both freshwater fish that are trapped on the downstream side and migratory fish that require an entry/exit route to the freshwater system, both smelt and sea trout are present in the Stour estuary. The design will also need to ensure that eel passage is maintained.
The River Stour has an augmented water supply from the Ely Ouse to Essex Transfer Scheme (EOETS), water is pumped from the Gt Ouse to the top of the rivers Stour and Pant. Located in the Lower Stour is one of the main water supply abstraction points at Cattawade Intake, Essex and Suffolk Water (ESW) abstraction licence number 8/36/15/*S/0123, NGR TM1004933059. Work has been undertaken in the latest round of the Water Industry Natural Environment Programme (WINEP) to ensure flow continues down the Lower Stour and North Channel during low flow conditions, rather than being abstracted from the middle reaches of the Stour, this has been implemented to prevent large scale fish mortalities and wider ecological harm in this section of the river, the EA has worked with ESW to secure 5mld for the operation of a fish passage solution in this section. The requirement to impound water in this section of the river for public water supply abstraction inhibits the possibility for barrier removal. This section of the River Stour is also a navigable waterway.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 4 Mar 2026 | Award (award) | · | b4850bee-1c9d-4645-bb57-20e81c3c8090-887053 |
more from Environment Agency
- Blaydon Quarry Landfill Gas Monitoring · £63,233 · 29 Jul 2026
- IMx - Phase 2 · £592,730 · 29 Jul 2026
- YNE AOMR Lot 1 Asset Recon Nunnington Channel Works · £76,486 · 29 Jul 2026
- KSL - Nav - East Farleigh Asset Refurbishment · £7,490,000 · 28 Jul 2026
- EAN - AOMR - East & National Eel Pass Programme · £4,791,694 · 28 Jul 2026
- NW - AOMR - Lot 2 25-27 GMMC MEICA D&B Package · £1,200,000 · 28 Jul 2026
- YOR - CDF - Tidal Ouse Left Bank Saltmarshe - SOC-OBC (ESE) · £64,282 · 28 Jul 2026
- YNE- Stokesley- MMF direct award- 26-27 FY · £74,739 · 28 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- The Provision of Ecology Services · Loughborough University
- Provision of Wastewater Quality Testing Service · Armagh, Banbridge & Craigavon Borough Council
- Biodiversity Net Gain (BNG) · NORTHUMBRIAN WATER LIMITED · £5,700,000
- SAMM (Strategic Access Management & Monitoring) for the Wealden Heaths Phase II Special Protection Area (SPA) · East Hampshire District Council · £432,000
- Production of seabird flight height distributions from at-sea laser rangefinder data · JNCC SUPPORT CO · £28,000
- Natural Capital Baselining on Glenlivet Estate · Crown Estate Scotland · £472,143
- Strategic Flood Risk Assessment and Water Cycle Study · Borough Council of Kings Lynn and West Norfolk
- National Marine Plan 2 (NMP2) Social and Economic Impact Assessment · Scottish Government · £8,834
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.